MD-019 Kwikstage Scaffolding Telescopic Steel Waling Platform Plank For Scaffolding
USD $2 - $9 /Piece
Min.Order:500 Pieces
Shisheng Scaffolding & Formwork Co., Ltd.
MD-018 Construction Cuplock Corrugated Steel Deck Plank Board For Scaffolding
Tianjin Shisheng Punched Scaffolding Steel Plank Without Hook
Tianjin Shisheng Galvanized Scaffolding Steel Plank/Walk Board/Catwalk
Tianjin Shisheng Pre-galvanized Perforated Steel Plank/Metal Decking/Metal Catwalk for Japan
Tianjin Shisheng Galvanized Perforated Steel plank/metal decking/metal catwalk for Philippines
Tianjin Shisheng Q235 Galvanized Scaffolding Steel Plank/ Walk Board for Sale
MD-019 Kwikstage Scaffolding Telescopic Steel Waling Platform Plank For Scaffolding
Applications | ||||
1.Scaffolding plank is the main parts of scaffolding system which is | ||||
convenient for workers to walk on high building. | ||||
2.Stamping holes are on the scaffolding plank to resist skidding for workers. | ||||
3.The galvanized surface makes scaffolding plank more stronger in the rainy days and moist | ||||
environment. | ||||
4. Various size of scaffolding plank could be customed. | ||||
Advantages | ||||
1.durable & stable | ||||
2.good bearing capacity | ||||
3.low cost, high quality | ||||
4.Excellent security function | ||||
5.easy to assemble & dismantle | ||||
6.long durability, the working life can up to 5-8 years | ||||
7.Corrode-resistant, Slip prevention, Anti-fire, Anti-sand, less weight |
Specifications | ||||
Name | Metal Deck /Decking /Plank /Walk Board | |||
Place of Origin | Tianjin, China (Mainland) | |||
Size | (more customized size available) | |||
Length (mm) | 1000 | 1500 | 2000 | (3000;4000) |
Width (mm) | 210 | 240 | 250 | (300;420;480;500) |
Height(mm) | 38 | 45 | 50 | |
Thickness(mm) | 1 | 1.1 | 1.2 | (1.5;1.8;2.0) |
Shape(Rib) | A.General Rib | B.V Stiffener | ||
Material | Q195-Q235 | |||
Good Market | Singapore ,Malyasia ,Middle East and Southeast Asia and all over the world | |||
Cerification | ISO9001:2008,SGS etc. | |||
Surface Finishing | pre-galvanized (Zinc Coated :60g/m2) | |||
Technique | automatic productive assembly line | |||
MOQ(Minimum Order Quantity) | one 20' container | |||
Payment | L/C at sight ;T/T | |||
Package | packed in bulk or in bundle. shipped by container or as client's request | |||
Production Capacity | 100000 pcs / month |
Scaffolding Metal Decking Production Process
Q1: Are you facetory or trade enterprise?
A:We are the integrated industrial and trade enterprise for 16 years.
Q2: How does your factory do regarding quality control?
A: Quality is the soul of a company. Dynast metal always attach great importance to quality controlling from the very beginning to the end.
Q3: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted).
Q4: Can we visit your factory?
A: Of course. You are walmly welcome. Before come to China, please contact us and we will arrange everything we can for you.
Name:Bright Yu
Tel: +86(22)83973806
Fax: ++86(22)83973806
Mobile: +86 15130735828
QQ:1015541985
E-mail:Bright(@)
Skype:Bright0102