China supplier 4mm 10mm thick mild steel sheet OEM with competitive price per ton in stock for building steel
USD $550 - $800 /Ton
Min.Order:5 Tons
s235 s275 S355 mild steel plate sheet favorable price per kg Malaysia
Large stock of q235 hot roll sheet hrc steel coil hot rolled steel coil with lowest price
SS400 10MM Hot Rolled Thick Mild Steel Plate 4x8 steel sheet with stock available
SS400 Steel Plate 1.8mm thick 4x8 mild steel sheet custom fabrication service
China supplier 4mm 10mm thick mild steel sheet OEM with competitive price per ton in stock for building steel
1.Product Description
Name :
| China supplier 4mm 10mm thick mild steel sheet OEM with competitive price per ton in stock for building steel |
Specification Width: | 1250mm,1500mm,1800mm,2mor as requested
|
Thickness: | 1.5mm,1.8mm,2.0mm,2.5mm,2.75mm,3.0mm,3.75mm,4.5mm,4.75mm,5.75mm,7.75mm,9.75mmor or as requested
|
Length: | Length more than 6m or as requested
|
Delivery Time | 3-5days in stock |
New Production | 10-15days |
2. HR steel sheet materials can be supplied
Carbon steel plate | A283GR.C/GR.D, ASTMA36, A573GR.58, A573GR.65, A573GR.70. SS400, SM400A, SM400B. SM400C, S235JR, S235J0, S235J2, S275JR, S275J0, S275J2, S275N, S275NL, S275M, S275ML, 250, 250L0, 250L15, Q235A/B/C/D, Q275A/B/C/D, |
Low Alloy steel plate | A572GR.50, A572GR.60, SS490, SM490N/NL, S460N/NL, S355M/ML, S420M/ML, S460M/ML, S500Q/QL/QL1, S550Q/QL/QL1,S620Q/QL/QL1, S690Q/QL/QL1, S355G8+N, 350, 350L0, 350L15, Q345A, Q345B, Q345C, Q345D, Q345E, Q390A, Q390B, Q390C, Q390D, Q390E, Q420A, Q420B, Q420C, Q420D, Q420E, Q460C, Q460D, Q460E, Q500C, Q500D, Q500E, Q550C, Q550D, Q550E, Q20C, Q620D, Q620E, Q690C, Q690D, Q690E, 890D, Q890E,Q960D, Q960E, XGCFQ500D, XGCFQ500E. |
General Strength ship plate, high strength ship plate, ultra high strength ship plate | A,B, C, D, E, A32,D32, E32, F32, A36, D36, E36, F36, A40,D40, E40, F40, A131A, A131B, A131D, A131E, AH32, DH32, EH32, AH36,DH36, EH36, AH40, DH40, EH40, NVA420, D420, E420, NVA460, NVD460, NVE460,NVA500, NVD500, NVE500, NVA550, NVD550, NVE550. |
Ship pressure vessel plate | NV360, NV410, NV460, NV490, NV510, LR360, LR360FG, LR410, LR410FG, LR460FG, LR490FG, LR510FG, |
Bridge plate | Q235QC/D/E, Q345QC/D/E, Q370QC/D/E, Q42QC/D/E, Q460QC/D/E, Q500QD/E, Q550QD/E, Q620QD/E, Q690QD/E, A709-50T-1/50T-2/50T-3/50F-1/50F-2/50F-3, A709-50W-A/B/C-F1/F2/F3-T1/T2/T3 |
Boiler pressure vessel plate | Q245R,Q345R,Q370R,15CrMoR,18MnMoNbR,13MnNiMoR, 12Cr1MoVR,12Cr2Mo1R,14CrMoR,16MnDR,09MnNiDR,15MnNiDR, 07MnCrMoVR,07MnNiCrMoVDR/12MnNiVR, Q245R, Q345R, 16MNDR.P235GH,P265GH,P395GH,P355GH,16Mo3, P275NH/NL1/NL2, P355N/NH/NL1/NL2, P460NH/NL1/NL2, P355M/ML1/ML2, P420M/ML1/ML2,P460m/ml1/ml2, P355Q/QH/QL1/QL2, P460Q/QH/QL1/QL2, P500Q/QH/QL1/QL2,P690Q/QH/QL1/QL2, 10CrMo9-10, 11MnNi5-3, 13CrMo4-5, 13CrMoSi5-5, 13MnNi6-3, 18MnMo4-5, 20MnMoNi4-5. (S)A204Gr.A/Gr.B/Gr.C (S)A285Gr.A/Gr.B/Gr.C (S)A299Gr.A/Gr.B,A302Gr.A/Gr.B/Gr.C/Gr.D, A387Gr.2/Gr.11/Gr.22. ASTMA455 (S)A515Gr.60/65/70, (S)A516Gr.55/60/65/70, (S)A516Gr.60(HIC), (S) A516Gr.60(R-HIC) (S)A517Gr.B/Gr.H (S)A533Gr.A/Gr.B/Gr.C (S)A537CL.1/CL.2/CL.3, ASTMA612, (S)A662Gr.A/Gr.B/Gr.C (S)A737Gr.B/Gr.C A738Gr.A/Gr.B/Gr.C (S)A841Gr.A/Gr.B/Gr.C/Gr.D SB410,SB450,SB480, SB450M/480M, SEV245/295/345, SBV1A/1B, SBV2/3, SGV410/450/480,SPV235/315/355/410, SPV450/490, SQV1A/1B/2A/2B/3A/3B |
High-rise Building Plate | Q235GJB/C/D/E. Q345GJB/C/D/E,Q390GJC/D/E, Q420GJC/D/E, SN400A/B/C, SN490B/C |
1. In bundles, each bundle weight less than 3 tons
2. in steel pallet with anti-rust paper, each pallet under 3 tons
3. in wood pallet with anti-rust paper, each pallet under 3 tons
4 steel processing
Steel plate processing, cutting parts, (cut to any size, cut by drawing)
Flame cutting for thick heavy plate, and laser cutting for steel plate thickness under 16mm
1. How long can make delivery?
For stock products, will make shipments in 3-5days after receiving deposit or receiving L/C; for products need new production for common materials, usually make shipments in 15-20 days; for products need new production for special and rare materials, usually need 20-25days to make shipment.
2. What is your payment terms?
L/C, D/A, D/P, T/T, Western Union and MoneyGram.
3.Once the received products found not comply with the products the contract demands, what will you do?
Once the received products found not comply with the products the contract lists, when receiving the pictures and the official documents and data from your side, if it is proved not comply, we will compensate the loss at first time.
PLESAE CONTACT:
EDNA BIAN
Welcome to visit our factory!