high quality hot sales s335j2 n hot rolled astm a36 steel plate price per ton
USD $480 - $620 /Ton
Min.Order:1 Ton
MS Carbon Steel Tear Drop Chequered S275jr SS400 A36 Q235 Checkered Steel Plate
A36 high strength ship steel sheets carbon steel plate steel plates made in China
ss 400 aisi 1020 ss41 carbon steel plate sheet with competitive price
a36 a38 a572 grade 50 standard specification carbon steel plate with competitive price
Q235B SS40 A36 Chinese hot rolled boiler quality ms steel plates
Details
Material : | S275J2, S275J0, S275JR, S355J0, S355JR, S355J2, S355J2 Hot rolled steel sheet and plate |
Thickness: | 1.2mm-25mm |
Width: | 1000mm-2500mm |
Length: | 1000mm-15000mm |
Heat treatment: | normalized or tempered |
1.Special size | We will customize the special size for you. |
2.The fastest delivery time | The delivery date of the spot goods is 2-3days |
3.The best quality | Actual MILL TEST CERTIFICATE |
4.Credible | We promise to give you the best price and best quality. |
5.The best service | We promise to reply to you within 12 hours
|
1.How long can make delivery?
For stock products, will make shipments in 5- 7 days after receiving deposit or receiving L/C; for products need new production for common materials, usually make shipments in 15-20 days; for products need new production for special and rare materials, usually need 30-40 days to make shipment.
2. Will the Test Certificate be certified to EN10204 3.1?
For the new production products no need furthur cutting or processing, will provide the Original Mill Test Certificate certified to EN10204 3.1; for the stock products and the products need cutting or furthur processing, will issue Certificate of Quality on our Company, It will show the original mill name and the original datas.
3. Once the received products found not comply with the products the contract demands, what will you do?
Once the received products found not comply with the products the contract lists, when receiving the pictures and the official documents and data from your side, if it is proved not comply, we will compensate the loss at first time.