wear-resistant black surface carbon hot rolled steel plate sheet with competitive price
USD $600 - $850 /Ton
Min.Order:1 Ton
different types of sae1020 astm a36 ss400 carbon steel plate with competitive price
q345d s335j2 n s335 hot rolled steel plate sheet with competitive price
hot rolled alloy carbon st37 st52-3 steel plate sheet with competitive price
10mm thick mild ss41 carbon hot rolled steel plain sheet with competitive price
oil tank st52 weight of 12mm thick low alloy steel plate sheet with competitive price
8mm astm a283 gr.c carbon high tensile steel plate sheet with competitive price
Product Description
Chemical composition | |||||
Grade | C | SI | Mn | S | P |
Astm A36 | 0.12-0.2 | >0.3 | 0.3-0.7 | >0.45 | >0.045 |
Astm A572 Gr50 | >0.2 | >0.4 | >1.5 | >0.05 | >0.04 |
Mechanical properties | |||||
Tensile strength(Mpa) | Yield strength(Mpa) | Elongation(%) | |||
375-460 | >235 | >26 | |||
>450 | >345 | >18 |
Specification Width | 1000mm,1250mm,1500mm or as requested |
Thickness | 1.5mm,1.8mm,2.0mm,2.5mm,2.75mm,3.0mm,3.75mm,4.5mm,4.75mm, 5.75mm,7.75mm,9.75mmor or as requested |
Length | 6m or as requested |
Delivery Time | 3-5 days |
Detaild Images
Packing & Shipment
20 feet container dimension | Width under 2300mm, length under 5800mm |
40 feet container dimension | Width under 2300mm, length under 11800mm |
By bulk vessel | large heavy can shipping by bulk cargo |
Our company
Related Products
FAQ
1. How long can make delivery?
For stock products, will make shipments in 5- 7 days after receiving deposit or receiving L/C;
for products need new production for common materials, usually make shipments in 15-20 days;
for products need new production for special and rare materials, usually need 30-40 days to make shipment.
2. Will the Test Certificate be certified to EN10204 3.1?
For the new production products no need furthur cutting or processing, will provide the Original Mill Test
Certificate certified to EN10204 3.1; for the stock products and the products need cutting or furthur processing,
will issue Certificate of Quality onour Company, It will show the original mill name and the original datas.
3. Once the received products found not comply with the products the contract demands, what will you do?
Once the received products found not comply with the products the contract lists, when receiving the pictures
and the officialdocuments and data from your side, if it is proved not comply, we will compensate the loss at first time.