corrosion resistant coating a53 steel tube
USD $480 - $580 /Ton
Min.Order:1 Ton
corrosion resistant coating a53 steel tube
Keywords: a53 steel tube
1. Description of a53 steel tube
1) Standard:ASTM A252/B36.10/A450/ A671/A53/ A523, GB/T9711/ GB/T3901, GB/T 13793,
BS1387, BS EN10296, BS 6323, BS6363, BS EN 10219,API 5L ..
2) Steel grade: SS400 S235jr S355jr ASTM A53 GR.B, GR.A ASTM A106 GR.B...
3) Specification:
Outer diameter: 20-610mm
Wall thickness: 0.5-12mm
Length: 4-14m
Detail picture of a53 steel tube, please check photo
2. Other terms for a53 steel tube
Trade terms: FOB CFR CIF.
Payment: T/T & L/C at sight,DP, papal, cash, O/A, etc
Delivery time: 7-15days after receiving the deposit.
Packing: In bundles, Damp cloth packing, in bulk.
Additional about delivery of a53 steel tube
20ft container Max length 5850mm, Weight 25-27 tons
40ft container Max length 12000mm, Weight 25-27 tons
Bulk vessel MOQ 50 tons.
3. Our Services
1) Samples: free
2) Lenght: any length can be cut for you.
3) Quality: accept THE THIRD PARTY INSPECTION.
4) OEM: Acceptable
5) Marking: company logo, company name, specification can painted on pipes.
6) OC documents can be offered.
Process of a53 steel tube
Ends: threaded with coupler and caps, bevel, groove, plain, etc
Surface: galvanized coating, black painting, 3PE coating, etc
Keywords: a53 steel tube
4. Company Profile
Tianjin Reliance Company , is specialized in manufacturing a53 steel tube. and many special service can be done for you.
such as ends threatment, surface finihsed, with fittings, loading all kinds of sizes'goods in container together, and so on.
Welcome to visit our a53 steel tube.
Our office is located in Nankai distric, Tianjin city, near beijing, the capital of China, and with excellent location.
It just takes 2 hours from beijing international airport to our company by high speed rail.
and the goods can be deliveryed from our factory to tinajin port for 2 hours. you can take
40 minutes from our office to tianjin beihai international airport by subway.
Exhibition of a53 steel tube in India.
5. Production process of a53 steel tube
Above photo is production process of a53 steel tube. It is including welding, cutting, inspection, packing, etc.
6. Factory testing of a53 steel tube
With advanced machine, We can check chemical component, mechanical property, water pressure, etc
Regular inspection: diameter, wall thickness, length, welding range, surface, etc
Above photo is a53 steel tube checking.
7. Customners all of the world
With more than 10 years export experience, the clients come from all over the world.
Main market: Middle East, Asian, Africa, Australia, USA, etc
Welcome to visit us, choose our a53 steel tube.
Customer Visit our factory, visit our a53 steel tube
RFQ
1.Are you factory or trading company?
We are factory, and two company branch company in tianjin city .
2.What is the MQO?
1Ton for nomal size.
3.What is the warry ?
We can deal on alibaba, that is , you pay it on alibaba, i send you goods, and when you get the documents, i can get the payment.
4. Could you do it according to the drawings?
Yes, including the ends treatments, and surface treatments.
Be free to send inquiry, best offer will be sent fast.
Products name: corrosion resistant coating a53 steel tube
Keywords: a53 steel tube