Aisi 1045 precision seamless cold rolled steel pipe
USD $1,230 - $1,300
Min.Order:1
Type | Aisi 1045 precision seamless cold rolled steel pipe |
Dimension | OD:30-250mm,WT:2-30mm |
Standard: GB/T8713 GB/T3639 DIN2391 EN10305 ASTMA106-2006
|
1.DIN Standard |
2.JIS standard: | |
3.ASTM/AISI standard | |
Technique | Cold drawing, cold rolling |
Usage | Seamless steel pipes for low and medium pressure boiler, high pressure boiler ship-building, liquid service petroleum cracking, chemical fertilizer equipment drawing-oil-equipment and structure purposes |
Package | bundle with steel strips black paint coating wooden box brand parcel as clients request |
Payment terms | L/C or T/T(30% deposit and 70% balance against B/L copy) |
Delivery | FOB, CIF, CFR, etc |
Shipment | 15 working days after getting payment |
Tolerance in Dimension
OD | GB/T3639(GB8713) | DIN2391(EN10305) | Our Tolerence | Best Quality |
4-30mm | ±0.10mm | ±0.08mm | ±0.05mm | ±0.02mm |
31-40mm | ±0.15mm | ±0.15mm | ±0.05mm | ±0.03mm |
41-50mm | ±0.20mm | ±0.20mm | ±0.05mm | ±0.03mm |
51-60mm | ±0.25mm | ±0.25mm | ±0.08mm | ±0.03mm |
61-70mm | ±0.30mm | ±0.30mm | ±0.10mm | ±0.05mm |
71-160mm | ±0.30mm | ±0.30mm | ±0.10mm | ±0.05mm |
Yantai Xinpeng Steel Pipe Co., Ltd
Yantai Xinpeng Steel Pipe Co., Ltd,established in Dec 1992, with registered capital of 5 million Yuan, we have more than 20 years experience in manufacturing and exporting steel pipe.
Our company mainly produces various specifications of cold finished precision steel pipe, which are widely used in hydraulic Pneumatic cylinder for automobile, engineering machinery, textile machinery, printing machinery, oil drilling and other field.
Our company are equipped with JLB250T hydraulic cold drawn set,LED120 cold rolling set, annealing surface, strong honed machine, polishing machine, lathe, saws CNC skived and roller burnished machine, kinds of testing machine. Strictly comply with ISO9001 System, assure the best quality of the products.
1) Compressed natured gas CNG tube
2) Drive transmission: steering column elements
3) Gear shafts, hand brake, front axles, airbag inflators, stabilizers, seat fasteners, front-wheel
drive shafts
4) Mechanical structure pipe parts in automobile,motorcycles and vehicle
5) Hydraulic cylinders
packaging details:
1.bundle with steel strips
2.brand parcel
3.wooden box
4.as clinets request
delivery details: 15days after payment
Q: What is your main payment itme?
A: T/T and L/C
Q: Are you trading company or manufacturer ?
A: We are manufacturer .
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment 30% T/T in advance ,balance before shippment.
Tel +86-535-6835398
Website: