Hydraulic using cold rolled seamless aisi 4130 steel tube
Hydraulic using cold rolled seamless aisi 4130 steel tube
Hydraulic using cold rolled seamless aisi 4130 steel tube

Hydraulic using cold rolled seamless aisi 4130 steel tube

USD $1,180 - $1,250

Min.Order:1

Supply Ability:
1000 per Month
Payment Terms:
T/T Credit Card

Quick Details View All >

Place of Origin:
Shandong, China
Certification:
CE
Thickness:
3, 30
Application:
Hydraulic Pipe
Surface Treatment:
Other
Technique:
Cold Drawn

Xinpeng Steel Pipe Co., Ltd.

Business Type: Other
Main Products: Steel Pipe , , ,

Product Details

Company Information

Hydraulic using cold rolled seamless aisi 4130 steel tube

 

Yantai Xinpeng Steel Pipe Co,.Ltd. is one of the best suppliers of hydraulic cylinder tube in North of China.

Since 2002 cold drawn machine set importing,

Xinpeng become a big precision steel pipe manufacturer with 500MT month productivity in the next 12 years.

Products widely used in the hydraulic cylinder of the heavy machinery, Cranes, excavator, forklifts and the Petrol industry.

Hydraulic using cold rolled seamless aisi 4130 steel tube

 

Product Description

Xinpeng (Estabilish in 1992)  Offer:

1. cold drawn/rolled steel pipe without anneal +BK condition 

2. cold drawn/rolled steel pipe annealed +BKS  condition

3. ID honed/SRB steel pipe, OD without polishing.

4. ID honed/SRB steel pipe, OD Polished.

Hydraulic using cold rolled seamless aisi 4130 steel tubeHydraulic using cold rolled seamless aisi 4130 steel tube
Cold Rolled Tube +BK (No Anneal)Cold Drawn Tube+BK (No anneal)
Hydraulic using cold rolled seamless aisi 4130 steel tubeHydraulic using cold rolled seamless aisi 4130 steel tube
Cold Drawn Tube +BKSCold Rolled Tube +BKS 
Dear Clients--Family

THANKS FOR ALL CLIENTS OF XINPENG FROM ALL OVER THE WORLD!

WITH YOUR TYUST, WE CAN GO AHEAD!

WELCOME TO BE NEW CLIENTS INTO OUR FAMILY!

 

 

Hydraulic using cold rolled seamless aisi 4130 steel tube 

Our Process

Hydraulic using cold rolled seamless aisi 4130 steel tube 

Size Range of Us

Hydraulic using cold rolled seamless aisi 4130 steel tubeHydraulic using cold rolled seamless aisi 4130 steel tube

Hydraulic using cold rolled seamless aisi 4130 steel tube

MECHANICAL PROPERTIES (we do much better than this)

Condition

Material Grade

T.S (MPa) lowest

Y.S (MPa) lowest

Elongation (%)

BKS

ST35 (10#)

≥420

≥315

≥14

BKS

ST45(20#)

≥520

≥375

≥12

BKS

ST52(16Mn)

≥580

≥420

≥10

GBK

ST35 (10#)

≥315

 

≥35

GBK

ST45(20#)

≥390

 

≥32

GBK

ST52(16Mn)

≥490

 

≥30

NBK

ST35 (10#)

340-470

≥235

≥32

NBK

ST45(20#)

440-570

≥255

≥30

NBK

ST52(16Mn)

490-630

≥335

≥28

 

Packaging & Shipping

1.Transportation: By Sea

20' FCL (means the length than 5,800mm)
40' FCL (means the length than 11,800mm)
2.Bulk cargo (means the quantity is more than 200MT)
3.With regards to other length or quantity, it should be taken by clients themselves
4.Delivery time: 25-35days to the dispatch port after receipt of T/T or L/C at sight.
5.Optional: wooden box; caps; vanished coating.
6.Payment: T/T or L/C at sight, T/T 100% in advance (If order less than 3MT)
7.Price item: FOB, CFR, CNF, C&F, CIF
8.Origin: China
9.Third party inspection: BV, SGS, Lloyds. The Expense needs to stand by clients.

Hydraulic using cold rolled seamless aisi 4130 steel tubeHydraulic using cold rolled seamless aisi 4130 steel tube 
Our Services

1. 24hours service via phone ,wechat alibaba trade manager. 

2. Good package and best container method.

3. Professional explanation with professional online service

4. Factory manufacturer can assure the best quality. 

5. Good delivery time as 15-30 days .

6. 3 years product assurance after usuage.

7. Good quality process in our own factory,

   each lot tube have their own 5 years'life card.

we always do our best to make deal with any clients, welcome to inquiry at any time!

 

Hydraulic using cold rolled seamless aisi 4130 steel tubeHydraulic using cold rolled seamless aisi 4130 steel tube 

FAQ

1. How many employees in your company?  

   More than50 people..

2 Could you produce the cylinder according to our request?

   Yes, we could design the cylinder according to your request or your drawing.

3 What's your main export market?

    Middle East, Africa, Southeast Asia, European and South America

4. What’s your leading time?

    About 10days to 35 days after payment.

5. What is your MOQ?  

    3-5tons start on each specification.

6. Can you sent samples?

    Yes we can, the freight need to stand by customer.

Any need or request, please feel free to contact us!

Contact Supplier

Mobile
12926419493

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Minerals & Metallurgy > Steel > Steel Pipes
Categories
Hi~