En10305-1 E355 cold drawn hydraulic using steel pipe per kg
En10305-1 E355 cold drawn hydraulic using steel pipe per kg
En10305-1 E355 cold drawn hydraulic using steel pipe per kg
En10305-1 E355 cold drawn hydraulic using steel pipe per kg
En10305-1 E355 cold drawn hydraulic using steel pipe per kg
En10305-1 E355 cold drawn hydraulic using steel pipe per kg

En10305-1 E355 cold drawn hydraulic using steel pipe per kg

USD $1,250 - $1,280

Min.Order:1

Supply Ability:
1000 per Month
Payment Terms:
T/T Credit Card

Quick Details View All >

Place of Origin:
Shandong, China
Certification:
CE
Thickness:
3, 30
Application:
Hydraulic Pipe
Surface Treatment:
Other
Technique:
Cold Drawn

Xinpeng Steel Pipe Co., Ltd.

Business Type: Other
Main Products: Steel Pipe , , ,

Product Details

Company Information

En10305-1 E355 cold drawn hydraulic using steel pipe per kg

 

Yantai Xinpeng Steel Pipe Co,.Ltd. is one of the best suppliers of hydraulic cylinder tube in North of China.

Since 2002 cold drawn machine set importing,

Xinpeng become a big precision steel pipe manufacturer with 500MT month productivity in the next 12 years.

Products widely used in the hydraulic cylinder of the heavy machinery, Cranes, excavator, forklifts and the Petrol industry.

En10305-1 E355 cold drawn hydraulic using steel pipe per kg

 

Product Description

Xinpeng (Estabilish in 1992)  Offer:

1. cold drawn/rolled steel pipe without anneal +BK condition 

2. cold drawn/rolled steel pipe annealed +BKS  condition

3. ID honed/SRB steel pipe, OD without polishing.

4. ID honed/SRB steel pipe, OD Polished.

En10305-1 E355 cold drawn hydraulic using steel pipe per kgEn10305-1 E355 cold drawn hydraulic using steel pipe per kg
Cold Rolled Tube +BK (No Anneal)Cold Drawn Tube+BK (No anneal)
En10305-1 E355 cold drawn hydraulic using steel pipe per kgEn10305-1 E355 cold drawn hydraulic using steel pipe per kg
Cold Drawn Tube +BKSCold Rolled Tube +BKS 
Our Process

En10305-1 E355 cold drawn hydraulic using steel pipe per kgEn10305-1 E355 cold drawn hydraulic using steel pipe per kg 

Our Certificate

Xinpeng have passed ISO9001:2015 verified.

Better quality System control best quality .

We have our own Labroarty on the mechanical test and UT testing! 

Qualiry Team 15 persons , Target of us is 3000PPM!

En10305-1 E355 cold drawn hydraulic using steel pipe per kg 

Dear Clients--Family

THANKS FOR ALL CLIENTS OF XINPENG FROM ALL OVER THE WORLD!

WITH YOUR TYUST, WE CAN GO AHEAD!

WELCOME TO BE NEW CLIENTS INTO OUR FAMILY!

 

 

En10305-1 E355 cold drawn hydraulic using steel pipe per kg 

Packaging & Shipping

1.Transportation: By Sea

20' FCL (means the length than 5,800mm)
40' FCL (means the length than 11,800mm)
2.Bulk cargo (means the quantity is more than 200MT)
3.With regards to other length or quantity, it should be taken by clients themselves
4.Delivery time: 25-35days to the dispatch port after receipt of T/T or L/C at sight.
5.Optional: wooden box; caps; vanished coating.
6.Payment: T/T or L/C at sight, T/T 100% in advance (If order less than 3MT)
7.Price item: FOB, CFR, CNF, C&F, CIF
8.Origin: China
9.Third party inspection: BV, SGS, Lloyds. The Expense needs to stand by clients.

En10305-1 E355 cold drawn hydraulic using steel pipe per kgEn10305-1 E355 cold drawn hydraulic using steel pipe per kg 
Our Services

1. 24hours service via phone ,wechat alibaba trade manager. 

2. Good package and best container method.

3. Professional explanation with professional online service

4. Factory manufacturer can assure the best quality. 

5. Good delivery time as 15-30 days .

6. 3 years product assurance after usuage.

7. Good quality process in our own factory,

   each lot tube have their own 5 years'life card.

we always do our best to make deal with any clients, welcome to inquiry at any time!

 

En10305-1 E355 cold drawn hydraulic using steel pipe per kgEn10305-1 E355 cold drawn hydraulic using steel pipe per kg 

FAQ

1. How many employees in your company?  

   More than50 people..

2 Could you produce the cylinder according to our request?

   Yes, we could design the cylinder according to your request or your drawing.

3 What's your main export market?

    Middle East, Africa, Southeast Asia, European and South America

4. What’s your leading time?

    About 10days to 35 days after payment.

5. What is your MOQ?  

    3-5tons start on each specification.

6. Can you sent samples?

    Yes we can, the freight need to stand by customer.

Any need or request, please feel free to contact us!

Contact Supplier

Mobile
12926419493

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Minerals & Metallurgy > Steel > Steel Pipes
Categories
Hi~