ASTM a106 gr.b cold drawn seamless steel pipe
USD $1.25 - $1.3 /Kilogram
Min.Order:5000 Kilograms
ASTM a106 gr.b cold drawn seamless steel pipe
Established in 1992!
Productation shows
|
Cold Rolled tube +BK | cold drawn tube +bk | cold drawn tube+BKS |
MECHANICAL PROPERTIES (we do much better than this)
Condition | Material Grade | T.S (MPa) lowest | Y.S (MPa) lowest | Elongation (%) |
BKS | ST35 (10#) | ≥420 | ≥315 | ≥14 |
BKS | ST45(20#) | ≥520 | ≥375 | ≥12 |
BKS | ST52(16Mn) | ≥580 | ≥420 | ≥10 |
GBK | ST35 (10#) | ≥315 |
| ≥35 |
GBK | ST45(20#) | ≥390 |
| ≥32 |
GBK | ST52(16Mn) | ≥490 |
| ≥30 |
NBK | ST35 (10#) | 340-470 | ≥235 | ≥32 |
NBK | ST45(20#) | 440-570 | ≥255 | ≥30 |
NBK | ST52(16Mn) | 490-630 | ≥335 | ≥28 |
THANKS FOR ALL CLIENTS OF XINPENG FROM ALL OVER THE WORLD!
WITH YOUR TYUST, WE CAN GO AHEAD!
WELCOME TO BE NEW CLIENTS INTO OUR FAMILY!
1. 24hours service via phone ,wechat alibaba trade manager.
2. Good package and best container method.
3. Professional explanation with professional online service
4. Factory manufacturer can assure the best quality.
5. Good delivery time as 15-30 days .
6. 3 years product assurance after usuage.
7. Good quality process in our own factory,
each lot tube have their own 5 years'life card.
we always do our best to make deal with any clients, welcome to inquiry at any time!
1.Are you a trading company or manufacturer?
We are the professional manufacturer of precision seamless steel pipe since the year 1992.
2. How can I get the price?
We usually quote within 24 hours after we get your inquiry by telling us the material, out diameter,
wall thickness length, quantity and application of the steel pipe which you need.
If you are very urgent to get the price.
please inform us in email so that we will regard your inquiry priority.
3. How can I get a sample to check your quality?
After price confirmation, you can require for samples to check our quality. we will provide you
the sample for free, however we could only make sure the same material, the dimension will be
much similar as your request but not same.
And customer should afford the charge of shipment.
4. What about the lead time for mass production?
Honestly, it depends on the order quantity and the season you place the order.
if normal order 25-30days.
5. What is your terms of delivery?
We accept FOB CIF EXW CFR.