EC210B Excavator pump EC210B Hydraulic main pump K3V112DT-9N24 14531855
USD $1,900 - $2,000
Min.Order:1
Orignal New EC210 Hydraulic main pump EC210 Excavator hydraulic pump K3V112DT-9N24 14531855
DH300-5 Excavator Hydraulic pump DH300-5 Hydraulic main pump K3V140DT-HN0V
Orignal New DH150 Excavator Hydraulic pump DH150-7 Hydraulic main pump K1024107A
Orignal New DH140 Hydraulic main pump DH140-3 Excavator main pump K1024107A
Doosan Daewoo K3v63DT Hydraulic Pump 2401-9041 DH130 Main Pump
EC210B Hydraulic pump EC210B Main Pump K3V112DT-9N24 14531855
EC210B Hydraulic pump EC210B Main Pump K3V112DT-9N24 14531855
Perfect and saftey package
The normal package is wooden box. If export to european countries,the wooden box will be fumigated.If container is too tigher,we will use pe film for packing or pack it according to customers special request.
We will send with wooden case by express, air, sea or land as your request.
If less than 45KG, I advise express like DHL, FEDEX, TNT...
If 45-300KG, I advise air to airport.
If more than 300KG, I advise sea to seaport and land to city.
1. Standard product design
2. High quality material selection
3. Advanced imported manufacture & testing equipment
4. Advanced manifacturing process and production technology
5. in the line with global standards
6. By long time testing, proved to be good condition
Jining Haide International Trade Company is located in the famous construction machinery city - Jining, Shandong province, China, and here is the base of Shantui bulldozer and PC... excavator factories. We are specialized in the export of construction machinery and parts.
We can supply genuine parts or OEM parts compatible with many brands. The products includes final drive, hydraulic pump, swing mtor, undercarriage parts, engine parts, excavator cab, boom arm bucket etc. We will supply you all parts with good quality and competitive price.
FAQ:
Q: How to guarantee the same?
A: Before sending, I will take pictures. After confirmation, I send.
Q: When to ship?
A: Once getting payment then arrange.
Q: Import customs fee?
A: It depends on import country. I can make lower valve so that you can pay lower customs fee even no need to pay.
Q: How long for transport?
A: For express/ air, it takes about 5 days. For land/ sea, it takes about one month. It depeds on your address.
Q: Product usage?
A; If any problem about usage, I will solve at first time.