Alga Vehicle-Mounted Compact Size Screw Type Sludge Dewatering Machine
USD $8,532 - $10,913 /Set
Min.Order:1 Set
Qilee Environmental Protection Equipment Co., Ltd.
Treatment Filter Manufacturers Spiral Sludge Dewatering Screw Press
Stacked Spiral Filter Press Sludge Dehydrator Wastewater Treatment Equipment
Effluent Treatment Solid Liquid Separator Screw Sludge Dehydrator
New Design Sewage Water Sludge Treatment Screw Press Separator
Coal Washing Waste Water Stainless Steel Screw Sludge Dewatering Machine
Algae Sludge Dewatering Machine Features:
1.Suitable for sludge dewatering of high/low consistency.
2.There is no need to worry about jam up. Reduce the cleaning water consumption.
3.The electrical cabinet, disposal tank and dehydrator are integrated, which reduces the covering area and brings convenience to installment.
4.The dehydrator is enclosed working, which reduces the bad smell and improves the working environment.
5.Automatically working for 24 hours, reducing the labor strength of workers.
6.The slow running speed of screw shaft reduces the power consumption and noise.
7. It is made with stainless, extending the service life.
8. It is convenient for daily maintenance.
Algae Sludge Dewatering Machine Structure:
The main part of the dehydrator is a filter device that a screw runs through the stacked fixed rings and moving ring.
The small gaps between fixed rings and moving ring can filter the sludge, and the lumenbetween screw and rings is filled with polymer grains. The moving ring transfers the sludge to the end of the machine with pressure and extrudes sludge cakes.
The running of the screw drives the moving ring to clean the gaps and avoid jam.
Algae Sludge Dewatering Machine Application:
•City mixed raw sewage,Food & beverage industry,Chemical industry,Leather & tannery sewage,Paper & pulp sewage,Elecro-plating sewage,Pringting & dyeing sewage,Power plant,Petrochemical industry
Algae Sludge Dewatering Machine Selection of models:
Model | Ds Standard Treating Capacity | Sludge Flow | ||||||
Low-high consistency | 2000mg/L | 5000 mg/L | 10000 mg/L | 20000 mg/L | 25000 mg/L | 50000mg/L | ||
QLD101 | ~3kg/h | ~5 kg/h | ~1.5m3/h | ~0.6 m3/h | ~0.5 m3/h | ~0.25 m3/h | ~0.2 m3/h | ~0.1 m3/h |
QLD131 | ~5 kg/h | ~10 kg/h | ~2.5 m3/h | ~2 m3/h | ~1 m3/h | ~0.5 m3/h | ~0.4 m3/h | ~0.2 m3/h |
QLD132 | ~10 kg/h | ~20 kg/h | ~5 m3/h | ~4 m3/h | ~2 m3/h | ~1 m3/h | ~0.8 m3/h | ~0.4 m3/h |
QLD201 | ~16kg/h | ~18 kg/h | ~4.5 m3/h | ~1.8 m3/h | ~1.5 m3/h | ~0.75 m3/h | ~0.6 m3/h | ~0.3 m3/h |
QLD202 | ~18 kg/h | ~30 kg/h | ~9 m3/h | ~3.6 m3/h | ~3 m3/h | ~1.5 m3/h | ~1.2 m3/h | ~0.6 m3/h |
QLD301 | ~30 kg/h | ~50 kg/h | ~15 m3/h | ~6 m3/h | ~5 m3/h | ~2.5 m3/h | ~2 m3/h | ~1 m3/h |
QLD302 | ~60 kg/h | ~100 kg/h | ~30 m3/h | ~12 m3/h | ~10 m3/h | ~5 m3/h | ~4 m3/h | ~2 m3/h |
QLD303 | ~90 kg/h | ~150 kg/h | ~45 m3/h | ~18 m3/h | ~15 m3/h | ~7.5 m3/h | ~6 m3/h | ~3 m3/h |
QLD304 | ~100 kg/h | ~200 kg/h | ~50 m3/h | ~10 m3/h | ~20 m3/h | ~10 m3/h | ~8 m3/h | ~4 m3/h |
QLD352 | ~120 kg/h | ~200 kg/h | ~60 m3/h | ~24 m3/h | ~20 m3/h | ~10 m3/h | ~8 m3/h | ~4 m3/h |
QLD353 | ~180 kg/h | ~300 kg/h | ~90 m3/h | ~36 m3/h | ~30 m3/h | ~15 m3/h | ~12 m3/h | ~6 m3/h |
Algae Sludge Dewatering Machine specifications & Operation Conditions:
Algae Sludge Dewatering Machine Flow Diagram:
1.The sludge in the sludge sump is carried to the measuring tank by sludge pump.And the sludge inlet volume can be controlled by adjusting the liquid level tube.
2.Sludge and flocculant will form alum floc in the disposal tank after agitator mixing, the ideal diameter of alum floc is about 5mm.
3.After gravity thickening in the thickening part, large amount of filtrate will discharge from the gaps between rings.
4.The thickened sludge is carried forward by the screw and dehydrated sufficiently under the pressure of the back pressure plate.
5.The dehydrated mud cake is discharged from the gaps between back pressure plates and screw body. The treating capacity of sludge and water content's rate of mud cake can be controlled by adjusting the running speed of screw and gaps between back pressure plates.
Algae Sludge Dewatering Machine Cooperation case:
Standard export carton packing.
3-20 days after confirming order,detail delivery date should be decided according to
production season and order quantity.