SONCAP Cheap Price Floating Fish Feed Pellet Making Machine
USD $1,000 - $20,000 /Unit
Min.Order:1 Unit
Brand |
TONDE |
Type |
Fish Feed Pellet Machine |
Capacity |
200-250kg/h |
Requirement of raw material |
Type: Flour, corn starch, rice bran, meat meal, bone meal, fish meal, etc. Size: about 60-80 mesh which were crushed and well mixed. Moisture content: about 20%-25% Starch content: ≥30% |
Usages of final pellets |
Aquatic feed pellets: fish, shrimp, frog, etc. Pet feed pellets: dog, cat, rabbit, chicken, goose, duck, pig, etc. |
Features |
|
√ Supply OEM, According to customers' needs or drawings.
√ Learn more about the machine and the latest price.
Supply Alibaba Trade Assurance Order Online
√ 100% Product quality protection
√ 100% On-time shipment protectio
√ 100% Payment protection
|
|
|
Model: TDP60-C | Model: TDP70-B | Model: TDP80-B |
Capacity: 100-150KG/H | Capacity: 180-250KG/H | Capacity: 300-350KG/H |
|
|
|
Model: TDP90-B | Model: TDP120-B | Model: TDP135-B |
Capacity: 400-450KG/H | Capacity: 500-700KG/H | Capacity: 800-1000KG/H |
Q1: What is the material for making fish feed pellet? |
A1: There is a wide selection for material. Such as corn flour, wheat meal, bone meal, meat meal, fish meal, etc. All can be used for making fish feed pellet. Please note that the raw material size should be 60-80 mesh. |
Q2: What is the size of the final fish feed pellet? |
A2: The size of fish feed pellet is 1-8mm, you can choose the size you like. |
Q3: The fish feed pellet machine is a single machine or a complete production line? |
A3: It depends on your chooice. The machine can work separately, also in a production line, from material crushing to final pellet packing. You can choose it freely. |
Q4: What is the production chart for the whole production line? |
A4: The production line is as follows: material crushing----mixing----making pellets----pellets drying----pellets cooling----pellets flavoring----pellets packing. |
Q5: What is the delivery time of the fish feed pellet machine? |
A5: Usually the single machine can be sent within 15 days after getting the deposit. If it is a large order or production line, the delivery time will be 25-35 working days after down payment. |