Drum-Type Water-Removing Machine/30-40kg/h Tea Leaf Rosting Machine
USD $490 - $3,000 /Set
Min.Order:1 Set
New Design Liquefied Gas Cylinder Type Water-Removing Machine Price
High-efficiency commercial barley tablet presses machine selling well
Soybean flattening machine Coffee beans flattening machine on sale
Wheat flattening machine,Grain flatting mill with large output
400kg/h Corn Flakes Flattening Machine/Coffee Bean Pressing Machine
Drum-Type Water-Removing Machine/30-40kg/h Tea Leaf Rosting Machine
Product information
This product is based on the principle of tea killing technology, integrated with domestic and foreign advanced killing technology developed "automatic killing machine", advanced structure, novel and novel shape, using automatic ignition, automatic constant temperature control system.
Principle
The fresh leaves continuously advance while being heated by a drum that is heated and rotated in the stove, while absorbing heat and evaporating water. Under the effect of the heat retained by the heat of the tube wall and the evaporation of water, the fresh leaves quickly become soft and ripe, and the activity of the enzyme in the tea leaves stops, thus completing the process of killing.
Using the step
1>Connect the power supply/device standby
After the equipment is checked and everything is normal, connect the power cord and the device enters the standby state.
2>Set parameters / temperature speed
On the control panel, start the power switch and set the parameters such as temperature/speed.
3>Connecting gas cylinder / ignition heating
Connect the gas cylinder, turn on the gas cylinder switch, the ignition will hit the automatic position, the gas exhaust will burn, and the inner drum will start to heat.
4> Temperature reached / cast leaf fried
When heating to a temperature close to the set temperature, the leaves can be placed and the frying is started.
5>Complete completion / unloading tea
After the completion of the killing, press the roller to unload the tea, close the cylinder, and the drum will idle to reduce the temperature to 60 ° when the equipment automatically stops.
Precautions
1. Do not adjust the speed of the drum of this machine too fast to prevent the rectifier from being broken down and causing malfunction.
2. This machine is strictly prohibited to use a lighter, candle and other tools for short-distance ignition.
3. The machine must be safe to use, non-workers should not operate, and children should not enter the workplace.
Product parameters
Model | WT-670 |
Power | 0.75kw |
Voltage | 220V/380V |
Dimensions | 181x102x165cm |
Drum inner diameter | 70cm |
Internal straight length | 108cm |
Speed | 5-36 rev / min |
Weight | 250KG |
Processing capacity | 30-40kg/h |
Heating method | liquefied gas (gas) |
Delivery time Within 5-7 days after receiving clients' payment
Payment Terms T/T L/C Western Union D/P D/A Escow Paypal
Packing wooden box free of Drum-Type Water-Removing Machine/30-40kg/h Tea Leaf Rosting Machine
Quality Gurantee: Quality gurantee term is for 1 years, Malfunctions which are caused by operation mistakely will be reponsible for customers
1 Qualtiy Gurantee 1 year guanrantees for each machine
2 Pre-Testing before forwarding All machines will be pre-tested to make sure it will be received
in good condition
3 Operation Video and instruction We will provide you operation video and detailed instructions to install and you can make full use of the machine
4 Full Techinical service Engineer is ready to provide you our full-process tracing
and instruction
Alibaba Assessed Gold Supplier
100% Quality control before forwarding
Competitive price withe best quality and service
Food machinery manufacturers
1 Are you manufacturer ?
Yes we are the manufacturer and welcome to visit our factory
2 Can you change the machine voltage as our request?
Yes we can change the machine voltage as customers’ request
3 How about your after-sale service?
Our engineer can go outside to install and train your workers to operate the full machine line.
4 Warranty time of your machine?
1 years warranty time except for consumable spare parts
5 How about delivery time of your machine?
Generally it needs 5-7 days, for big machines or producing line, it will be much longer but within our negotiated delivery time