Egg breaker for liquid egg extracting egg separating machine
USD $10,000 - $80,000 /Set
Min.Order:1 Set
Features
1.Made of the304 stainless steel.
2.Easy to operate and clean.
3.Full automatic.
4.Automatic feeding, cleaning, checking,drying,breaking full egg fluid or separating the egg white from the egg yolk.
5.Drum knock eggs,egg numbers 3,6.
6.Electric control.Digital display instrument display tank water temperature, thermocouple temperature control, when the water temperature is lower than the set temperature, heater temperature to set temperature automatically.
7.Stop: equipment with abrupt stop
Technical data
Model | Egg numbers | Capacity | voltage | power | size(L×W×H) |
WT-538-3 | 3 | 10,000pcs/h | 380V | 0.75Kw | 3000*1000*1500.MM |
WT-538-6 | 6 | 20,000pcs/h | 380V | 0.75Kw | 3000*1000*1500.MM |
1.Delivery time: Within 5-7 days after receiving clients' payment
2.Payment Terms :
3.Packing: Wooden box free of fumigation
4.Quality Gurantee: Quality gurantee term is for 1 years, Malfunctions which are caused by operation mistakely will be reponsible for customers
1. Qualtiy Gurantee :1 years guanrantees for each machine
2. Pre-Testing before forwarding :All machines will be pre-tested to make sure it will be received
in good condition
3. Operation Video and instruction :We will provide you operation video and detailed instructions to install and you can make full use of the machine
4. Full Techinical service :Engineer is ready to provide you our full-process tracing
and instruction "
1.Alibaba Assessed Gold Supplier
2.100% Quality control before forwarding
3.Competitive price with best quality and service
1. Are you manufacturer ?
Yes we are the manufacturer and welcome to visit our factory
2. Can you change the machine voltage as our request?
Yes we can change the machine voltage as customers’ request
3. How about your after-sale service?
Our engineer can go outside to installand train your workers to operate the full machine line.
4. Warranty time of your machine?
1 years warranty time except for consumable spare parts
5. How about delivery time of your machine?
Generally it needs 10-15 days,for big machine or producing line,it will be much longer but wthin our negotiated delivery time