Folding Trolley/Heavy Duty Platform/Industry Handing Cart
USD $25 - $100 /Piece
Min.Order:10 Pieces
Folding Trolley/Heavy Duty Platform/Industry Handing Cart
Product introduction:
1. Move supplies, files, office equipment, tools, samples or electronics
2. Great for airports, delivery personnel, sales people, re-stocking, mailrooms, general office use and computer rooms
3. Steers easily with hard rubber casters – two rigid and two swivel
4. Vinyl perimeter bumper protects walls, doors and furniture
5. Ships partially assembled Folding platform truck features 1" tubular steel handles. PVC Surround Bumper helps protect walls and furniture. Handle folds down for easy storage.
Features of Foldable platform trolley:
1>No noise, no clatter-silent and hygienic.
2>Load weight:200kg
3>Light weight. Easy to operate.
4>Trolley handle folds flat onto deck for ease of storage and transportation.
Technical parameter:
Model | WT-150 | WT-200 | WT-250 | WT-300 |
Load weight | 150kg | 200kg | 250kg | 300kg |
Platform size(L*B) | 720*490mm | 825*500mm | 825*500mm | 900*600mm |
Net weight | 9.6kg | 11.6kg | 13kg | 14.5kg |
Gross weight | 10.5kg | 12.65kg | 14kg | 15.6kg |
Packaging size(mm) | 730*180*500 | 845*200*525 | 845*240*525 | 920*230*640 |
Usage | Tools | |||
Material | plastic |
Delivery time: Within 5-7 days after receiving clients' payment
Payment Terms:T/T L/C Western Union D/P D/A Escow Paypal
Packing: wooden box free of fumigation for High efficiency hot wind cycle drying oven hot air drur Quality guarantee term is for one year, Malfunctions which are caused by operation mistakenly will be responsible for customers
1 Quality guarantee
2 Pre-Testing before forwarding
3 Operation Video and instruction
4 Full Technical service
1 Manufacturer for hand trolley
2 Alibaba Assessed Gold Supplier
3 100% Quality control before forwarding
4 Competitive price withe best quality and service
1 Are you manufacturer ?
Yes we are the manufacturer and welcome to visit our factory
2 Can you change the machine voltage as our request?
Yes we can change the machine voltage as customers’ request
3 How about your after-sale service?
Our engineer can go outside to install and train your workers to operate the full machine line.
4 Warranty time of your machine?
1 years warranty time except for consumable spare parts
5 How about delivery time of your machine?
Generally it needs 5-7 days, for big machines or producing line, it will be much longer but within our negotiated delivery time