Starch extract equipment/Cassava flour/powder/starch machine
USD $10,000 - $10,000
Min.Order:1
Lavender harvester machine and rice wheat cutting machine for popular selling
High efficiency lavender cutting machine and grass harvester machine for sale
New agriculture machine household multifunctional tea reaper harvest machine equipment
Low price rice cutting machine and beans harvester machine for sale
Low price for lavender cutting machine and grain harvester machine for sale
Tuber crops/cassava/sweet potato/potato/Lotus root starch extracting equipment
Description:
It is used for extracting starch from potato, sweet potato, kudzu root, lotus root,cassava etc..
Suitable for the farmers individual and small scale processing.
Application:
Uses in the sweet potato, the potato, the Kudzu root starch extraction.
suitable object:
The peasant household disperses the processing use, the peasant household small
scale processing to use
equipment outline:
the overflow elutriate type yam flour mill is my factory after the tune network extrusion
yam flour mill develops
successfully, the full analysis and in the discussion yam milling principle's
foundation, synthesized suiting which the domestic
and foreign milling equipment's good and bad points.
main parameters:
Model | TZ-1000 | TZ-2000 | TZ-3000 | TZ-5000 | |
Capacity (T/H) | 1 | 2 | 3 | 5 | |
Motor (KW) | Washing machine motor | 1.5 | 1.5 | 1.5 | 1.5 |
Cleaning and separating machine motor | 5.5 | 7.5 | 10 | 20 | |
Second separating motor | 1.5 | 1.5 | 2.2 | 2.2 | |
Water consumption (M3 / H ) | 8 | 10 | 12 | 15 | |
Covering area (M2 ) | 30 | 50 | 60 | 100 | |
Operators needed | 2 | 2 | 2 | 2 |
1. Are you manufacturer?
Yes, we are. Welcome to visit our factory.
2. Can you change the machine voltage as our request?
Yes, we can.
3. How about your after-sales service?
Our engineer can go outside to install and train your workers to operate the full machine line.
4. Warranty time of your machine?
1 year except for consumable spare parts.
5. How about delivery time of your machine?
Generally it needs 5-7 days for big machines or producing line,and it will be much longer but within our negotiated delivery time.