chestnut processing machine chestnut peeler machine
USD $1,000 - $1,500 /Set
Min.Order:1 Set
1.Berief introduction of the chestnut machine:
The chestnut sheller machine can be adjusted automatically according to the size of the fruit.
It solves the problem that the size of chestnut fruit in the north and south is different, too large and easy to break, too small and unshelled.
The main roller of the chestnut sheller has added a hose, so that the skin of the fruit after shelling is smooth without scratches and the kernel has no cracks.
The air selection function of the machine separates the fruit from the peel without impurities and the fruit is clean.
Single-phase power supply, low power consumption, small size, light weight, easy to install and move.
It can be used by chestnut farmers and is also available for large businesses. In addition, only a small replacement and adjustment of the machine can be used for shelling of corn, pine, corn and other crops.
2.Parameter of the chestnut peeler machine:
Model | Weight | Power | Size | Voltage |
TZ-600 | 39kg | 2.2kw | 1100*650*980mm | 220v |
3.How to use the chestnut peeler machine:
1. Before use, you must read the instruction manual carefully and be familiar with the performance characteristics and operation methods of this unit.
2. Before starting the machine, a comprehensive inspection must be carried out. The fasteners must not be loose, the handles are flexible, and the pulleys are rotated by hand. The running parts should be normal and there should be no abnormal noise.
3. The machine is connected to the power supply. After the power is turned on, the spindle should rotate counterclockwise. In any case, the machine must have a good grounding device, otherwise it will not be turned on.
4. Press the motor button (to turn the main unit switch to the positive position). The main unit starts to run and the direction of rotation should be counterclockwise.
4.Pictures of the chestnut machine:
Our other machine :
https://zztaizy.en.china.cn/
1. Are you manufacturer?
Yes, we are. Welcome to visit our factory.
2. Can you change the machine voltage as our request?
Yes, we can.
3. How about your after-sales service?
Our engineer can go outside to install and train your workers to operate the full machine line.
4. Warranty time of your machine?
1 year except for consumable spare parts.
5. How about delivery time of your machine?
Generally it needs 5-7 days for big machines or producing line,and it will be much longer but within our negotiated delivery time.