palm oil processing plant palm oil refining machine crude palm oil refining machine
USD $3,000 - $7,000 /Set
Min.Order:1 Set
Brief Introduction:
There are certain Nontriglyceride factors exsit in the crude oil, such as free fatty acid, water, suspended impurities, volatile matter, odors and etc. The oil refinery adopts the advanced technology to separate the impurities from oil, and then get the edible oil. The main function of this type oil refinery is to produce the high quality refined oil.By degum pot and decoloring cans and hoist system composition, this equipment adopts full stainless steel material, set the food grade materials measurement device,automatic temperature control device, adiabatic device and enters the material buffer
device,which can realize oil degum, take off acid, dry and decoloring function.
Product show:
Application scope
Refining crude oil : soybean oil, mustard seed oil, cottonseed oil, sunflower seed oil, peanut oil, rice bran oil, safflower seed oil, corn germ oil, camellia seed oil, etc.
Operating procedures:
1.The oil fully contacting with the decolorant can improve the decolorization efficiency and reduce the usage of decolorant.
2.The continuous and uniform material flows will balance the decoloring time and avoid the recovery of grease oxidation and acid value.
3.The special mixing structure of decoloring tower won't cause the material dead area, which can avoid the adsorbent sedimentation and pipe blockage.
4.The continuous airtight efficient filtration equipment has realized the automation of cake discharge and reduced the labor intensity.
5.The advanced drying technology can reduce the oil content in filter cake.
Main parameter:
Model | Power | volume | Size |
TZY-A2 | 4.5kw | 360L | 130*90*160cm |
TZY-AB2 | 2.2kw | 600L | 200 x 110x 180cm |
TZY-A3 | 2.2kw | 900L | 300×110×180cm |
Our other machine:
https://zztaizy.en.china.cn/
1. Are you manufacturer?
Yes, we are. Welcome to visit our factory.
2. Can you change the machine voltage as our request?
Yes, we can.
3. How about your after-sales service?
Our engineer can go outside to install and train your workers to operate the full machine line.
4. Warranty time of your machine?
1 year except for consumable spare parts.
5. How about delivery time of your machine?
Generally it needs 5-7 days for big machines or producing line,and it will be much longer but within our negotiated delivery time.