plastic outdoor hdpe privacy pop up beach tent sun shade sail
USD $5.9 - $23 /Piece
Min.Order:100 Pieces
plastic outdoor hdpe privacy pop up beach tent sun shade sail
The main types of shade net are HDPE shade sail, Waterproof shade sail, Polyester shade sail.
Ring:Stainless D ring or triangle ring at the corner
Shade sails are desigined to cover outdoor areas and provide protection from the harmful effects of the U.V. Rays of the Sun.Knitted Fabrics contain millions of specially designed air holes that allow air to flow freely through to create a significant cooling effect beneath. Superior fade resistance.
Pad Eye;
Used to attach shade sail corner ring to a wall in conjuction with "D" shackle.
In size 6mm or 8mm, other sizes are available on request;
S Hook;
used to link shade sail corner to pad eye or eye bolt;
Normally in size 6mm or 8mm, other sizes availabe on request
Turnbuckle;
used to attach shade sail corner ring to a fixing point and provide tension to the sail.
Size in 8mm or 10mm;
Eye Bolt;
used to to form a fixing through a timber post.
Size: 8x130mm, other size available on request.
D Shackle;
Used to link shade sail corner to pad eye or eye bolt.
In size 6mm or 8mm, other sizes available on request
Snap Hook:
used to link shade sail corner to pad eye or eye bolt.
Size mostly in 8x80, 10x100mm
Chains;
Used to fix shade sail;
In size 4mm x 2metre
Master Cleat.:
Used to hold rope for shade sail;
B- In size 5inch
How to make a shade sail
Gather your supplies
Step 1
Lay sail out on ground. For a 5 x 3m sail running parallel to wall, it should be 300mm from wall to allow for tensioning. Mark out positions of posts and wall or fascia fixings, allowing an extra 300 and 500mm from each corner to allow for tensioning. Square and rectangular sails are normally installed as a hyperbola, so diagonally opposite posts or fixing points are high or low.
Step 2
For each post, dig a 400 x 400mm hole 800-1000mm deep. If ground is firm, lay about 100mm of 20mm aggregate in base of hole. If ground is soft, pour about 100mm of concrete in hole.
Step 3
Bore a hole near bottom of pole and insert a galvanised steel bolt with nut. This keys post in concrete and stops round posts rotating. Fit a heavy-duty, stainless-steel eye bolt 50-100mm down from top of posts. Use double nuts (1 a lock nut) so it cannot undo.
Step 4
Stand posts in holes with eye-bolt facing diagonally opposite post. Brace posts with temporary props and ensure they are plumb in 2 directions.
Step 5
Fill each post hole with a fairly dry concrete mix and tamp concrete well. For most smaller sails (under 5m square), posts can be vertical, but for larger sails, move top of post away from opposite post by 150-200mm, so it leans out from sail slightly to help take the strain. Re-tamp concrete and finish surface with a slight slope away from post so water can drain. Let concrete cure for 24-48 hours.
Step 6
While concrete cures, secure wall and fascia pad eyes, if required. Never rely on the fascia alone; fit fascia supports to fasciae and rafters first to give adequate strength. If fixing to masonry, use an appropriate anchor system. In many cases, a chemical anchor is ideal, but an alternative is to use epoxy together with a conventional masonry anchor.
Step 7
Once concrete has cured, spread sail back out on ground. Attach fixings to corners of sail with turnbuckles wound out to as slack as possible (you will need turnbuckles on at least 2 corners). Lift each corner to an eye bolt, then tension sail using turnbuckles or tension straps. If you need to extend length of fixing, use straps. Re-tension fixings as necessary over time and clean sails periodically.
Packaging Details: one piece packed in one hangbad and one label one rope in it.
Shipping Details: Within 10 days get the order.
About us
Aining Group which is aiming to research and develop plastic products and welding materials, is composed of
Aining Plastic Products Co.,LTD. and Hebei Aining Welding Consumable Co.,LTD.
Hebei Aining Import and Export Trading Co.,LTD. is the export department of Aining Group.
We have a full range of production equipment,advanced technology,scientific management and inspection systems so that can meet the exact requirements of our customers for various welding material products.
With an experienced and professional team,we have exported our products to many countries and regions all over the world.Our products enjoy a good reputation among our customers.
Aining Group scrupulously abides by the policy of "Quality first and Credit first". In the spirit of win-win results, we
would like to serve you with our best efforts.
Welcom to visit our factory and expect to cooperate with you.Give us a chance, and we will return you a surprise!
Why choose us?
1. Professional Service for Products.
2. Much More Competitive Price.
3. Honest and Excellent Supplier.
4. Delivery Time is Shorter than Others.
5.We believe the good quality is the basis for cooperation.
6.We can provide free samples to you for test.
7.Our company policy is Qulaity First and to establish Long Term business not just for one time.