hot sale UV treated polypropylene safety net for construction
USD $1 - $15 /Piece
Min.Order:100 Pieces
DEBRIS & SAFETY PROTECTION
• High tenacity knotless polypropylene net with debris liner
• Base net: 2" and 2.5" square nets
• Debris net liner: 3/8" or 1/16"options
• Net Options: 2,000 lb., 5,000 lb., 10,000 lb. rating
• Perimeter edges include sewn reinforced webbing & grommets
• Meets ANSI A10.37 for debris containment during construction & demolition
• Complies with OSHA regulations for debris protection
• Extra UV inhibitors for added life expectancy
• Flame Retardant nets available & made to order
• Protects small & chunk debris from falling during construction & demolition
• Protects tools from falling
• Protects pedestrians & adjacent properties
• Provides leading edge protection
• Durable, reliable, long-lasting
• Available in black, gray and tan
• All nets are tested and approved
• Construction & Demolition debris containment
• Vertical building construction
• Building restoration
• Construction elevator shafts
• Bridge construction, maintenance and repairs
• Tunnels and overpass construction
• Industrial plants & refineries
• Offshore oil rigs
• Marine ship repair industry
About us Since being erected in 2011, Shandong Huian Meixin Building Materials Co., Ltd has been focusing on quality and responded services, over years, we have gained reputations and long-term trust from clients all over the world.
Our products range covers scaffolding safety sheet, reinforced truck tarpaulins, shade sail, tents which are widely used in construction, gardening and landscape areas and so on.
Customer demands and satisfaction is always upheld as the foremost priority, we cherish every opportunity to provide quality goods and considerate services.
1. Are you a factory or trading company?
We are factory erected in 2011.
2. Where is your factory located? How can I visit you?
Our factory is located in Chenji Industrial Development Zone, Heze city, Shandong Province, China. 27400
3. How can I get samples?
Samples are free of charge, while customer will bear the courier fees which is repaid with orders placed.
4. How about goods quality?
Only stable quality supplier is adopted into our supply chain, and strict QC processes are applied all through the fabrication processes as well.
5. What is the MOQ?
2 tons.
6. How long is the delivery?
25 days for a 20' GP normally, 35 days for a 40' GP.