Economic gantry type cnc vertical 5 axis mould machine center for sale
USD $70,000 - $75,000 /Set
Min.Order:1 Set
Turn Mill CNC Machine Co., Ltd
The gantry machining center is a kind of gantry frame type machining center with fixed beam and removable workbench.
It is of the advanced level among similar lathe, and it is a kind of advanced equipment with high efficiency, high precision and high reliability.
The structure and technology of lathe is maturity, it’s quality is stable, and it can process the milling, drilling, boring, reaming and tapping of parts precisely and efficiently. It can also realize clamping parts all at once, and can finish the parts processing of top, forward, backward, left, and right side, which especially adapt to the processing of parts, mould, and complex surface.
It is widely used in general machinery, aviation, aerospace, automotive, nuclear industry, energy, mould, locomotive, heavy duty machine, engineering machinery, ships, machine tools, electronics, printing, textile and other manufacturing industries.
Shandong Hunk Precision Machinery Co.,Ltd, is a CNC machine tools factory, located in the beautiful capital Jinan city, integrated with manufacturing, processing and sales. It was set up by the former Jinan Machine tools factory employees.The plant area is about 10,000 square meters. We have a number of R&D persons and technicians who have more than 20 years experience of machine tool design and assembly. We have mastered the advanced machine tool technology and were dedicating to service customers domestic and abroad and welcomed deeply.
Our Workshop
Our Warehouse
Our Team
* Inquiry and consulting support.
* Sample testing support.
* View our Factory.
* Training how to instal the machine, training how to use the machine.
* Engineers available to service machinery overseas
Packing Details : Export Packing, wooden case
Delivery Details : 50 days after receiving the deposite
A: We are factory and we have our own company for exporting.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.