(1) The major basic parts such as the lathe bed, lathe feet, the middle supporting plate, the spindle box are all made of HT250 cast iron.
(2) The middle supporting plate together with the whole lathe bed, the middle slip plate and the sliding surface of supporting plate are all adopt the line rail technology of Taiwan.
(3) The feed of X, Z direction adopts the inner loop preloading large-lead ball screw with double nut so it is of high feed speed.
(4) Spindle box is designed of high gear position and low speed rotation, which greatly increased the torque in the process of chipping.
(5) The two guide rail of X, Z direction and screw are all adopt protective device, which ensures the cleanness of lead screw and guide rail.
(6) The outer protective device of the whole lathe is of the full protective structure. It is easy to operate, safe and reliable and beautifully designed.
(7) The lathe uses a reliable automatic and central lubricating device. It can lubricate automatically and intermittently to all lubrication points of CNC lathe.
(8) The operating system of the lathe adopts the principle of ergonomics so that it could be operated conveniently.
Q: Do you have after sales support?
A: Yes, we are happy to give advice and we also have skilled technicians available, We need your machines running in order to keep your business running.
Q: Once we've bought a machine from you, are you able to supply us with material?
A: We can assist you in finding the appropriate materials to suit your machine
Q: Do you sell only standard machines?
A: No, most of our machines are built according to customers specifications, using top brand name components.OEM is acceptable
Q: Do you have a warranty on your machines?
A:Twelve months warranty excluding electrical components.
Q: What sales terms do you have?
A:T/T, L/C,West Union.
Q: Do you have instruction manuals?
A: We provide you with instruction manuals, electricity layouts, civil requirements, and machine drawings or Video Support,
Q: Once machine arrives at our factory what happens then?
A: We will send you a technician or engineer that will commission and install your machine, with training for your staff if required at a separate fee.
Q: What do I need to offload my machine from the container?
A: You are not responsible for the offloading of your machinery, and it is recommended that you use a reputable rigging company.
Q: What kind of controls/Parts do you use on your machines?
A: AMS, OMRON, Schneider, Siemens, and ASK,ABBA,OPTIMA(ITALIA),HSD
Q: What is your delivery time?
A: Depending on the type of machine, duration of 10 days to 45 days from date of order.
Q: Do we receive any updates while machine is in the manufacturing process?
A: Yes.Regular updates on progress will be sent to you.