SINOLINKING Gold Dredging Ship Gold Mining Barge
SINOLINKING Gold Dredging Ship Gold Mining Barge
SINOLINKING Gold Dredging Ship Gold Mining Barge
SINOLINKING Gold Dredging Ship Gold Mining Barge
SINOLINKING Gold Dredging Ship Gold Mining Barge
SINOLINKING Gold Dredging Ship Gold Mining Barge
SINOLINKING Gold Dredging Ship Gold Mining Barge

SINOLINKING Gold Dredging Ship Gold Mining Barge

USD $48,000 - $50,000

Min.Order:1

Supply Ability:
1000 per Month
Payment Terms:
T/T Credit Card

Suction Dredger Co., Ltd

Business Type: Association
Main Products: Cutter Suction Dredger , , ,

Product Details

Related Products

SLK-MGT10 with sluice

SLK-MGT20 with sluice

SLK-MGT50 with sluice

SLK-MGT100 with pulsating sluice

SLK-MGT100 with centrifugal concentrator and pulsating sluice

SLK-MGT200 with centrifugal concentrator

We are professional of gold/diamond mining equipment manufacture in China since 2002, we have exported to over 35 countries with more than 300 successful projects. We can design and produce gold mining plant with processing capacity of 3-5 tons to 400 tons per hour, the gold dredger is 50 tons to 400 tons per hour. If you are interested, please click above to inquiry us, we will provide one-step gold mining solutions for your mining.

Description

Features of Gold Dredging Ship Gold Mining Barge

1) The SLK-WD series gold bucket dredger are designed according to your specific mining conditions and requirements.

2) Dredging depth could be min 5 meters and max 30 meters.

3) Processing capacity could be 50tph-400tph.

4) The chain bucket system digs the materials from river/sea bottom, convey it up and feed into the trommel.

5) Double sieve trommel screen with NSK bearings and high pressure water spray pipes on both sides for washing, screening and separating.

6) Double gold recovery systems to ensure highest recovery rate of gold (up to 98%).
7) Water supplying systems with multiple sets of big power submersible slurry pumps, hoses, valves, etc.

8) Powering system with Cummins diesel generator with all batteries, cables and wires.

9) Gold refinery plant to make final product of gold bars.
10) Easy for installation, operation and maintaining.
11) One-Sop gold mining solutions from A to Z.

Specifications of Gold Dredging Ship Gold Mining Barge
Model
WD100
WD200
WD300
Parameters
Dredging depth
Dredging depth
Dredging depth
Dredging depth 
Capacity
100 tph
200 tph
300 tph
Power
150 kw
200 kw
300kw
Bucket size/ cubic
0.04
0.04
0.12
Clay Scrubber /mm
φ1000*2000
φ1200*3000
φ1500*3000
Trommel Screen /mm
φ1200*3000
φ1500*3500
φ1800*4000
Sluice Box
2 sets
3 sets
4 sets
Water Supply /m³
120 m³
240 m³
370 m³
Concentrators
1
2
4
Recovery Rate
98%
98%
98%
Detailed Images
Technical Details


Chain bucket system

Name: chain and bucket system
Chain material: forged high-manganese steel
Bucket material: High-Manganese steel with forged lips, anti-tearing
Bucket size: depending on the dredger processing capacity

Function: to dig the materials from pond/river/sea bottom



Clay Processing System

Name: Clay Scrubber
Size (mm): φ1200*3000 or according to processing capacity
Remark: with inside water spray pipes
Function: to break off hard clays to increase gold recovery


Screening System

Name: Gold Trommel Screen
Size (mm): φ1500*3500 or according to processing capacity
Remark: 2 layer trommel screen
Function: for washing, screening and separating the minerals
Water spray pipes: on both sides of the trommel
Mesh size: 12mm and 6mm or according to clients requirement


Coarse Gold Recovery System

Name: Vibrating Sluice + sluice box
Vibrating sluice type: Hydraulic type
Size: 1m*6m
Sluice box carpet: Mitsubishi brand, imported from Japan
Function: for coarse gold recovery
Recovery rate: 99%


Fine Size Gold Recovery System

Name: Knelson type centrifugal concentrator
Processing capacity: 15tph-60tph dry solids
Quantity: 2-4 pcs
Remark: fully continuous type
Function: for fine size dust gold recovery (-6mm)
Recovery Rate: 99%



Control system

Name: Control desk
Type: buttons type
Control person: 1 person
Funciton: to control all the equipment in the dredger



Powering system

Name: Cummins diesel Generator
Power: 100Kw-350Kw
Brand: Cummins, Weichai, or as required
Function: supplying power to all the systems



Gold Shaker Table

Model: 6S
Power: 2.2Kw
Function: to further process the concentrates from the sluice and/or concentrators


Mercury Amalgamator

Type: V-shaped
Working mode: amalgamator + distiller retort

Function: with the help of Mercury, to extract all the gold out from the concentrates that recovered by the sluice and concentrators
Recovery rate: 100%



Gold Smelting Furnace

Capacity: 10-15kg per batch
Moulds: 100g; 200g; 500g; 1000g
Function: to smelting the gold sand and make into final product of gold bars

Gold Mixture

Pure gold sand

Gold bars after smelting

Our Service

Pre-Sales Service                                                               After-Sales Service

* Receiving clients inquiry                                                                * Design outlet with 3D drawing photo
* Studying clients mining conditions                                              * Producing according to the design

* Introducing our machinery                                                             * Inspection and testing before delivery
* Propose the most suitable solution                                             * Engineers installation and training service overseas

Packing & Delivery
Packaging of Gold Dredging Ship Gold Mining Barge
Container type
20'GP, 40'HQ
Container qty
1-6 pcs
Delivery time
10-30 days
Price items
EXW, FOB, CIF
Spare parts
Free spare parts avaiable
1: How long takes for installation ?
   -Normally within 7-10 days if everything is ready.
2: What are the oversea service charge ?
   -Airline tickets, visa fees and salary
Our Factory

Why Chose Us?

1. 15 Years factory

2. Exported to 35 countries

3. Over 300 projects worldwide

4. All customized design

5. Ensure highest recovery rate of gold

6. Short delivery time

7. Easy to install, operate and maintain

8. Super durable heavy duty machine

9. One-stop mining solution

10. Turn-key operations

FAQ

1. Are you factory?

Yes, established in 2002, over 15 years factory

2. How big are you?

In total 4 work shops, 12,000㎡, office 2000㎡, 65 workers

3. What equipment do you build?

Specialized in alluvial/placer gold/diamond mining equipment

4. Whats the capacity of the gold/diamond mining equipment

from 5TPH to 450TPH

5. What brand engine/diesel generator do you use?

Cummins, Weichai, Yuchai, etc, or as required

Contact Us

Contact Supplier

Mobile
12851808882

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Energy & Mineral Equipment > Mining Machinery > Dredger
Categories
Hi~