Alluvial Gold Tailing Mining Equipment
Alluvial Gold Tailing Mining Equipment
Alluvial Gold Tailing Mining Equipment
Alluvial Gold Tailing Mining Equipment
Alluvial Gold Tailing Mining Equipment
Alluvial Gold Tailing Mining Equipment
Alluvial Gold Tailing Mining Equipment

Alluvial Gold Tailing Mining Equipment

USD $35,000 - $38,000 /Set

Min.Order:1 Set

Supply Ability:
4 Piece / Pieces per Month
Port:
Qingdao
Payment Terms:
T/T Credit Card

Quick Details View All >

Brand Name:
SINOLINKING
Place of Origin:
Shandong, China
Model Number:
SLK-MGT100
Certification:
ISO9001 CE BV SGS
After-sales Service Provided:
Engineers available to service machinery overseas
Warranty:
24 Months

Suction Dredger Co., Ltd

Business Type: Association
Main Products: Cutter Suction Dredger , , ,

Product Details

DESCRIPTION

Features of Alluvial Gold Tailing Mining Equipment

1) The SLK-MGT series gold washing plant are designed according to your specific mining conditions and requirements.

2) Feeding system with grizzly hopper feeder, water spray pipes inside the hopper for spray waters to the soils.

3) Heavy duty clay scrubber with inside high pressure water spray pipes for breaking off hard clay. (if required)

4) Double sieve trommel screen with NSK bearings and high pressure water spray pipes on both sides for washing, screening and separating.

5) Double gold recovery systems to ensure highest recovery rate of gold (up to 98%).

6) Water supplying systems with multiple sets of big power submersible slurry pumps, hoses, valves, etc.

8) Powering system with Cummins diesel generator with all batteries, cables and wires.

9) Multiple sets of heavy duty mining type tires with towing mechanism for fully mobility and portability.

10) Gold refinery plant to make final product of gold bars.

11)  Easy for installation, operation and maintaining.

12) One-Stop gold mining solutions from A to Z.

SPECIFICATIONS OF ALLUVIAL GOLD TAILING MINING EQUIPMENT
Model
MGT50
MGT100
MGT200
Parameters
Size /mm
7000*2000*3000
8300*2400*4700
9800*3000*5175
Capacity
50-80 tph
100-150 tph
200-300 tph
Power
50 kw
120 kw
150 kw
Feeder Hopper /mm
2000*2200
3000*2200
3800*3000

Clay Scrubber /mm
φ1000*2000
φ1200*3000
φ1500*3000
Trommel Screen /mm
φ1200*3000
φ1500*3500
φ1800*4000
Sluice Box
2 sets
3 sets
4 sets
Water Supply /m³
120 m³
240 m³
370 m³
Wheels
6 wheels
10 wheels
10 wheels
Recovery Rate
98%
98%
98%
Detailed Images
Technical Details

1.Feeding System

Name: Grizzly Hopper Feeder
Size (mm): 2000*2000
Grizzly screen space: 150mm or as required
Grizzly material: Railway tracks
Remark: Water spray pipes along hopper sides
Function: to feed the materials evenly to the scrubber and trommel

2.Clay Processing System

Name: Clay Scrubber
Size (mm): φ1200*3000 or according to processing capacity
Remark: with inside water spray pipes
Function: to break off hard clays to increase gold recovery

3.Screening System

Name: Gold Trommel Screen
Size (mm): φ1500*3500 or according to processing capacity
Remark: 2 layer trommel screen
Function: for washing, screening and separating the minerals
Water spray pipes: on both sides of the trommel
Mesh size: `12mm and 6mm or according to clients requirement

4.Coarse Gold Recovery System

Name: Vibrating Sluice + sluice box
Vibrating sluice type: Hydraulic type
Size: 1m*6m
Sluice box carpet: Mitsubishi brand, imported from Japan
Function: for coarse gold recovery
Recovery rate: 99%

5.Fine Size Gold Recovery System

Name: Knelson type centrifugal concentrator
Processing capacity: 15tph-60tph dry solids
Quantity: 2-4 pcs
Remark: Fully continuous type
Function: for fine size dust gold recovery (-6mm)
Recovery Rate: 99%

6.Water Supplying System

Name: Submersible slurry pump
Quantity: 1-3 pcs
Water flow: 120-400m³ per hour
Function: for supplying water to the wash plant

7.Powering system

Name: Cummins diesel Generator
Power: 100Kw-350Kw
Brand: Cummins, Weichai, or as required
Function: supplying power to all the systems

8. Gold Shaker Table

Model: 6S
Power: 2.2Kw
Function: to further process the concentrates from the sluice and/or concentrators

9. Mercury Amalgamator

Type: V-shaped
Working mode: amalgamator + distiller retort

Function: With the help of Mercury, to extract all the gold out from the concentrates that recovered by the sluice and concentrators
Recovery rate: 100%

10. Gold Smelting Furnace

Capacity: 10-15kg per batch
Moulds: 100g; 200g; 500g; 1000g
Function: to smelting the gold sand and make into final product of gold bars

Gold Mixture

Pure gold sand

Gold bars after smelting

Our Service

Pre-Sales Service

* Receiving clients inquiry

* Studying clients mining conditions

* Introducing our machinery

* Propose the most suitable solution


After-Sales Service

* Design outlet with 3D drawing photo

* Producing according to the design

* Inspection and testing before delivery

* Engineers installation and training service overseas

Packing & Delivery
Packaging of Alluvial Gold Tailing Mining Equipment
Container type
20'GP, 40'HQ
Container qty
1-6 pcs
Delivery time
10-30 days
Price items
EXW, FOB, CIF
Spare parts
Free spare parts avaiable
1: How long takes for installation ?
   -Normally within 7-10 days if everything is ready.
2: What are the oversea service charge ?
   -Airline tickets, visa fees and salary
Our Factory

Why Chose Us?

1. 15 Years factory

2. Exported to 35 countries

3. Over 300 projects worldwide

4. All customized design

5. Ensure highest recovery rate of gold

6. Short delivery time

7. Easy to install, operate and maintain

8. Super durable heavy duty machine

9. One-stop mining solution

10. Turn-key operations

FAQ

1. Are you factory?

Yes, established in 2002, over 15 years factory

2. How big are you?

In total 4 work shops, 12,000㎡, office 2000㎡, 65 workers

3. What equipment do you build?

Specialized in alluvial/placer gold/diamond mining equipment

4. Whats the capacity of the gold/diamond mining equipment

from 5TPH to 450TPH

5. What brand engine/diesel generator do you use?

Cummins, Weichai, Yuchai, etc, or as required

Contact Us

Doris Du 


One-Stop Gold Mining Solutions

with Turn-Key Operations

Whatsapp: 0086 189 0636 9839

Wechat: 0086 189 0636 9839

Skype:  doris.du7

Email: doris at

Related Products

200TPH Gold Wash Plant

91.8% Response Rate

100TPH Gold Wash Plant

91.8% Response Rate

100TPH Diamond Wash Plant

91.8% Response Rate

Contact Supplier

Mobile
12851808882

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Energy & Mineral Equipment > Mining Machinery > Mineral Separator
Categories
Hi~