Dredging depth 15m China Sand Dredger Cutter Suction Dredger Ship
USD $225000.00 - $230000.00 /Set
Min.Order:1 Set
qingdao Suction Dredger Co., Ltd
Experienced Factory 2018 Hot Sale OEM Sand Dredger Sand Carrier Ship Manufacturer
Brand Engine river Cutter Suction Dredger machine from China in sale
Cutter Suction Dredger World-famous Engine Available for river sand dredging with low price
High Efficient Best Dredging depth 15m Cutter Suction Dredger machine in sale
New Type Sand Cutter Suction Dredger Ship To Africa with low price
technical Parameters | ||||||
Types | CSD200 | CSD250 | CSD300 | CSD350 | CSD400 | CSD450 |
Productivity | 200m3/h | 240m3/h | 300m3/h | 500m3/h | 720m3/h | 1000m3/h |
Dredging depth | 0-15m | 0-15m | 0-15m | 0-15m | 0-18m | 0-18m |
Main engine power | 250KW | 330KW | 410KW | 800KW | 1300KW | 1500KW |
Discharge distance | 0-1500m | 0-1500m | 0-1500m | 0-1500m | 0-1500m | 0-1500m |
Cutter head diameter | 1.0m | 1.2m | 1.2m | 1.4m | 1.5m | 1.8m |
Suction/discharge pipe diameter | 250/200mm | 300/250mm | 350/300mm | 400/350mm | 450/400mm | 500/450mm |
Water flow rate | 980m3/h | 1200m3/h | 1400m3/h | 2400m3/h | 3600m3/h | 5400m3/h |
The advantages of cutter suction dredging equipment:
1.The cutter suction dredging equipment is wide-range in application, it can work in rivers and lakes, and be used for dredging, channel excavationl and reclamation.
2. The cutter suction dredging equipment has good economy. The excavation and transportation of materials can be completed at one time, and it is not necessary to cooperate with other equipment, so the engineering cost is lower relatively.Cutter suction dredging equipment has large production, and the pump discharge distance is far.
3.The cutter suction dredging equipment has the advantages of simple operation and easy control.With the wirerope of the two side ofcutter arm frame and the anchor fixed on the two side of the channel,and depending on towing by windlass hatchback, through the swing to cutter sediment material, and work in the control of swing angle, then the twist material through the mud pipe to convey to the specified location.
packing details:In container or as customer's request
delivery time:30-60 days after receipt of deposit
Diesel engine:
Pipe and float:
Desilting pipeline:
Electric winch:
Dredge pump: