HL 500 3500 m3 /h hydraulic cutter suction dredger
USD $1,250,000 - $1,300,000 /Set
Min.Order:1 Set
1.Overview
The dredger is a not self-propulsion, hydraulic cutter suction dredger. The pontoon part is made up of several boxes. The dredger equipments include sideslip device, cutter up and down device, location spud device, deck crane and so on. The main engine is an independent entrainment form, one main pump engine, one auxiliary hydraulic engine. Dredger pump host output belt has clutch reduction function.
Dredger pump is driven by the main gear decelerating box.
Lighting and emergency power for stopping working will be offered by the generator set.
Cutter will be driven by the motor and cutter bearing with lubricating sealing device.
Hydraulic pump will be driven by the gear box through auxiliary engine
2.Technical specifications
| Name |
| HLC 500 Hydraulic cutter suction dredger |
| Type |
| Cutter suction dredger |
| Year |
| 2016 |
| Dimensions | ||
| Dredger after assembly |
| Length*width*depth 27*8.5*2.5 m |
| Engine room pontoon |
| Length*width*depth 15.4*3.5*2.5 m |
| Side pontoon |
| Length*width*depth 24*2.5*2.5 m |
| Structure |
| Can be dismantle and assemble at working site |
| Max.dredging depth |
| 15m |
| Discharge distance |
| 1500m |
| Average draft |
| 1.7m |
| Diameter suction pump |
| 600mm |
| Diameter discharge pump |
| 500mm |
| Working capacity |
| 15~20% |
| Water flow |
| 3500m 3/ h |
| Main engine power |
| 895Kw Cummins KTA38-M2 |
| Auxiliary engine power |
| 298Kw Cummins NTA855-M |
| Hydraulic winch |
| 100Kn |
| Hydraulic cutter power |
| 170kw |
| Diameter spud cylinder |
| 160mm |
| Emergency genset power |
| 30GF Weichai |
| Max. oil consumption |
| 240L/H |
1. Pre-sale services:
Select proper equipment model;
Design and manufacture products according to clients' special requirement;
Arrange for visiting our factory, assist them to handle relative procedure, such as visa.
2. Services during the sale:
Make sure goods prepared within delivery time;
Pre-check and accept products ahead of delivery;
Prepare documents required to help customer pass customs clearance.
Help clients to make Project evaluation and feasibility analysis and draft solving plans.
3. After-sale services:
Assist clients to prepare for the first construction scheme;
Install, debug and examine the equipment;
Train technical personnel the first-line operators;
Provide technical exchanging;
Offer spare parts at a best price for long term.