River bank using Gold mining dredge boat equipment for sale
USD $10,000 - $60,000 /Set
Min.Order:1 Set
Gold Dredging Equipment CO.,LTD
Brief Introduction
This set of gold mining plant is river+land work unit,it can be a good performance for river bank gold separating,feeding with excavator and work capacity of material ≤6mm is 160-200tph;This set of plant with our newly designed 1200# horizontal automatic discharge concentrator,can solve the problem as the balance of traditional knelson series centrifugal concentrator,and we upgraded the trommel screen with more efficient to classify the mixture of raw material.
Technical process
The raw material into feed hopper by excavator,then swilling by high pressure water into trommel screen to get rid the clay and calssified into 2size,≥6mm and ≤6mm,the material ≥6mm is scrap material transported by conveyor to destination;
The material ≤6mm into mineral box and send into land mobile gold separating plant,which iscomposed of 2set 1200# horziontal gold concentrator,the concente finally get and scrap getting rid.
Normally we manufacture the parts in workshop,when workers accomplish and finish the work the QC exame,then installl the dredger to check wholly running and marks when disassemble the dredger.All of this is to a good quality and performacne of dredging machine.
a.Manufacturing
b.Install the dredger in factory
c.Marks for next time installation of buyerside
After the teset and pre-installation in factory and finally the container loading comes and there are some points here what we do to keep the dredger in good condition.
a.Save space of container to load more commodity
b.Keep the heavy cargo/commodity on bottom of container and iron wire fixed to make it tight without movement in container
c.Load evenly,prohibit the center of gravity on one single side instead of center of container
4.Who we are
5.What we can do for you
1. High quality and most competitive price
----We could provide the factory price to you.
----The factory has have more than 10 years' production experiences.
----In addition, we are famous for our gold separating machines. And the city qingzhou we located in was the home of gold separating machine in China.
2.Win-Win-------our aim is benefiting each other and get more business from customers
3. Fast delivery-----Goods be sent out within 7 to 30 days based on order quantity.
4. Best service-----Answering your e-mails&solving questions timely. Delivery and update information on time. Trust, good quality and service are the basic of long-term business.
6.Contact us