5 Inch gold dredge equipment mobile gold mining boat
USD $5,000 - $7,500 /Set
Min.Order:1 Set
Bucket Chain Gold Dredger CO.,LTD
All of our gold dredgers are designed according to the customer's needs and in the assistance of high -tech, The gold dredger is paved with a new type of rubber mat to ensure the efficient of gold recovery. For experienced prospectors, usually require convenient carrying, outstanding effect, so this gold dredger is an ideal equipment. The floating system can operate in a variety of conditions, including deep and urgent water conditions. According to your needs and budget ,we provide you with the corresponding engine and air compressor.
This is a powerful multi function 5 inch gold dredger, drived by two sets of 6.5 Honda engine, the small engine can easily be transported to remote areas, can also be applied to other devices, such as higher working table and smaller gold dredger. The sister- engine configuration has been popular in recent years, an KAC Air compressor can be used for two divers.
Specification for Mini gold dredger
1)High recovery rate:
The recovery rate can be over 90%.
2)High efficiency:
The gold mining machinery's working capacity can reach 200 t/h. High efficiency means fast payback of investment.
3)Easy to operate:
Only two persons can operate the machinery.
4)Easy to maintain:
The dredger is designed with simple structure. All the mechanical parts are connected strongthly and easy to change by the operators. And the spare parts can be supplied by the for the buyers in low price.
5)No pollution:
All the gold mining machinery only consumes water and electricity power with low noise, and no chemical involved.
6)Reliable performance:
The machinery has a simple & tough structure. All the parts are from reputed brand and the main frame is made by strong steel materials. And all the equipments will be tested well before delivery.
We provide 12months quality warranty to make sure your machine well runs consistently.
a. Professional engineer design the production line for you
b.Recommend suitable equipment according to your special demand.
a.Pre-check and accept products before delivery
b.Send technicians to the jobsite for guiding the installation and adjustment
c.Training operators and finishing the check to satisfy your requiremnet
a.Common problem can be solved through web in 24 hours,complex problem can be reacted immediately in 24 hours and solved as soon as possible
b.To establish long-term friendship, we will regulary contact with our customers.