Trommel screen gold mining machinery for Canada
USD $10,888 - $88,888 /Set
Min.Order:1 Set
Bucket Chain Gold Dredger CO.,LTD
Gold trommel screen drum trommel screener gold mining equipment
gold wash plant for sale alaska gold mining equipment auction gold trommelcanada
mobile gold trommel washing plant hot sale mulching machine gold purify machine
gold washing plantscreening plant gold wash plant for sale in australia
gold mining machinery in south africa gold washing plants for sale in ghana gold trommelplans free
gold mining equipment china homemadegold trommelplans gold wash plant sale
Gold trommel screen wash plant
Brief Introduction:
--High capacity,75-120m³/h
--Gold recovery rate to be proved higher than 97%
--Can be move easily
--Maximize design life
--Suitable for remote area.
--Need a minimum of operator
--Lower operating and maintenance cost.
Gold mining machine equipment trommel screen wash plant :
Woking in New Zealand:
Producing:
Gold mining machine equipment trommel screen wash plant:
NO | Item | Spec | Mark |
1 | Capacity | 75-100m³/h |
|
2 | Overall Length after assembled | 14.5m(belt conveyor 8m) |
|
3 | Overall Width | 8.4m |
|
4 | Overall Height | 5.8m | Include grizzly |
5 | Valid Screen Area | 16.2m2 |
|
6 | Trommel Screen Diameter | φ1500mm |
|
7 | Sluice Box Area | 2*4m2 |
|
8 | Recovery Method | Rubber Mat |
|
9 | Mesh Size | 6-10mm(Optional) |
|
10 | Material Hopper | 6mm Steel Plate,15mm Reinforced Rebar,6mm Rubber Liner |
|
14 | Water Pump | 10/8 Inch | Optional |
15 | Water Flow/Lift | 600m³/h,32m | |
17 | Rated Power/Rotate Speed | 110kw/1500r | |
18 | Operator | 1 People |
|
19 | Fuel Consumption | 128kwx0.178L=22.8L/h | Full Load |
Gold mining machine equipment trommel screen wash plant shipment: One 40' container.
2018-Moscow Mining Exhibition:
Proffesional manufacturer of gold mining machinery, have more than 15 years experience, supply one-stop gold mining solutions:
1. Raw ore sample testing;
2. Complete processing flowchat desigh;
3. Supply full sets alluvial gold mining equipments;
4. Engineers come to mining site for installation, workers training;
5. OEM&Customization are welcome.
More informmation please feel free to contact me,thanks for your kindly attention.