Construction Machinery Parts Used Sandblasting Hose for Pumps
USD $0.5 - $50 /Meter
Min.Order:100 Meters
Construction Machinery Parts Used Sandblasting Hose for Pumps
Sandblast hose
Tube: black conductive NR-abrasion resistant
Reinforcement: high tensile textile cords
Cover: black conductive SBR-NR, abrasion and ozone resistant
Applications: sandblast
Temperature: -30°C + 80°C
ID mm | Layers | OD | WP | KG | Maximum | ||
mm | inch | (mm) | (Bar) | Kg/m | Ib/ft | Length(m) | |
25 | 1 | 2 | 47 | 15 | 0.99 | 0.66 | 40 |
32 | 1 1/4 | 2 | 55 | 10 | 1.53 | 1.03 | 40 |
38 | 1 1/4 | 2 | 61 | 10 | 1.59 | 10.7 | 40 |
38 | 1 1/2 | 3 | 63 | 10 | 1.74 | 1.17 | 40 |
51 | 2 | 2 | 74 | 7 | 2.00 | 1.34 | 40 |
51 | 2 | 3 | 76 | 7 | 2.20 | 1.48 | 40 |
65 | 2 1/2 | 3 | 89 | 7 | 2.70 | 1.81 | 40 |
76 | 3 | 3 | 101 | 6 | 3.43 | 2.30 | 40 |
76 | 3 | 4 | 103 | 7 | 3.74 | 2.51 | 40 |
89 | 3 1/2 | 3 | 114 | 6 | 4.01 | 2.69 | 40 |
89 | 3 1/2 | 4 | 116 | 7 | 4.39 | 2.95 | 40 |
102 | 4 | 3 | 127 | 5 | 4.57 | 3.07 | 40 |
102 | 4 | 4 | 129 | 7 | 4.98 | 3.34 | 40 |
125 | 5 | 3 | 154 | 5 | 6.83 | 4.58 | 20 |
125 | 5 | 4 | 156 | 6 | 7.30 | 4.90 | 20 |
125 | 5 | 5 | 158 | 7 | 7.85 | 5.27 | 20 |
152 | 6 | 4 | 179 | 3 | 8.06 | 5.41 | 20 |
152 | 6 | 5 | 183 | 5 | 9.28 | 6.23 | 20 |
203 | 8 | 5 | 234 | 3 | 12.11 | 8.13 | 10 |
203 | 8 | 6 | 240 | 5 | 12.90 | 8.66 | 10 |
254 | 10 | 6 | 292 | 3 | 18.10 | 12.15 | 10 |
254 | 10 | 8 | 296 | 5 | 19.99 | 13.41 | 10 |
Packing details: woven bag packing or according to customer's requirment
Delivery detail: within 15 days after receive the deposit
We can offer OEM Services
We can provide FREE SAMPPLE for our customers
We can crimp hose assembly for our customers.
We welcome clients to visit our factory leading to better understanding of our production.
How do we control our quality?
1. Material inspection: All material will be inspected by our Q/C before or when producing for all our orders.
2. Production inspection: Our Q/C will inspect all production procedures and production reports will be issued and sent to you.
3. Product and packing inspection: Final inspection report will be issued and sent to you.
4. Shipment advice will be sent to customers with loading photos.