FHB2-350 High Efficiency Glass Powder Water Treatment Machine
USD $65,000 - $66,000
Min.Order:1
shandong Glass Sandblasting Machine Co.,Ltd
The different selection of sewage treatment equipment, the effect of the treatment is different also, high cost or even outrageous, but an efficient solid and liquid separator can solve the stone/glass production process of sewage treatment and sludge dewater process. After years of stone waste water treatment experience, can save 50% of operating costs in the process of operation, set 3-4 sedimentation pools near the production area. No. 1 and No. 2 pools with slope pool, the slope should be based on the forklift's ability to get in and out, add sedimentation agent more than 10 meters before the No. 1 import, sludge dewatering using a high-efficiency solid-liquid separator starting from No. 3, No. 1 and No. 2 sludge is denser sludge and sand can be directly shoveled out with a forklift.
1. It occupies small space, normally only need 6-8 square meters, easy and convenient installation.
2. Excellent results, simple process, good sealing, good corrosion resistance, good working environment, long work ability, strong processing power.
3. This machine good price with relatively low cost of using and low maintenance cost, simple maintenance.
4. With large desliming quantity, no need water flush, and will not cause secondary pollution.
5. With big water output.
No. | Technical specification | FHB2-350 Parameter |
1 | Roller diameter | 350 mm |
2 | Roller length | 1000 mm |
3 | Max rotate speed | 5400 rpm |
4 | Max separation factor | 3180 |
5 | Working capacity | 1.0 – 10 m3/h |
6 | Motor power | 15 kw |
7 | 1 year | |
8 | Weight | 1800 kg |
9 | Overall size | 3185x840x1180 mm (LxWxH) |
10 | Match machines | Whole factory (Small one) |
1. CN, CE or UL Standard.
2. The warranty is valid within one year from installation.
3. The spare parts due to quality or design problem, we will change it free of charge or in case of necessary, we will send our technician/engineer to the buyer factory for repairing it and related labor cost, we will cover it
.
Standard export carton packing.
30 days after confirming order,detail delivery date should be decided according to
production season and order quantity.