tempered microwave glass plate machine
USD $78,000 - $106,000 /Set
Min.Order:1 Set
hebei Glass Tempering Furnace Parts Co.,Ltd
tempered microwave glass plate machine
1. Brife introduction of microwave glass plate machine
This tempering furnace is a kind of special curved tempered glass processing equipment , can be processed into a certain shape of round, square or shaped flat glass after soften with continuous heating, to mold surface forming and then cooling and tempering the forming glass, so special-shaped curved toughened glass is finished .Processed products are mainly used for the pot cover , fruit bowl , microwave oven etc .
2.Main parts of microwave glass plate machine
The furnace includes loading table, heating section, mould pressing section, cooling and tempering section and unloading table, blowing system, air path system and electrical controlling system.
3. Technical Parameter of microwave glass plate machine
Model | Max. glass diameter (mm) | Min. glass diameter(mm) | Thickness(mm) | Capacity (pcs/h) | Total Power(kw) | Dimension(m) |
HG450 | 450 | 120 | 3.5-5 | 500 | 370 | 19.5*4*1.9 |
4.Application of microwave glass plate machine
5. Features of microwave glass plate machine
1) Traditional and classic model, special insulation layer design, lower furnace body temperature.
2) Lattice intelligent heating mode, adjustable power, and excellent glass heated uniformity.
3) Upper and lower moulds can be changed and adjusted manually to position accurately
4) Rotating blowing and cooling locations, 2 tempering locations
6. Electrical Parts Configuration of microwave glass plate machine
Electrical parts | Brand |
Electrical system | Omron(Japan),Siemens(Optional) |
Ceramic rollers | Zhongcai(China famous brand), VSV(Optional) |
Insulated cotton | Luyang(China), ISOLITE(Optional) |
Heating wire | Cr15Ni60 |
Motor | Made in china, ABB(Optional) |
Frequency inverter | Schneider(France),CONVO(Germany),Mitsubishi(Optional) |
7. Our service
1) Before delivery, workshop layout drawing etc to guide to build workshop.
2) When delivery, technical manual and operation manual etc to guide workers
3) After delivery, 1-2 technicians will be sent to install and train for 2 weeks abroad. Meanwhile, 1 year guarantee to replace easy damaged parts for free.
8. Our factory
9.Quality certification
10. Exhibition