Heavy-Duty Drawer Racking; Heavy-Duty Die Racking
Heavy-Duty Drawer Racking; Heavy-Duty Die Racking
Heavy-Duty Drawer Racking; Heavy-Duty Die Racking
Heavy-Duty Drawer Racking; Heavy-Duty Die Racking
Heavy-Duty Drawer Racking; Heavy-Duty Die Racking

Heavy-Duty Drawer Racking; Heavy-Duty Die Racking

USD $100 - $400 /Set

Min.Order:1 Set

Supply Ability:
99999 Set / Sets per Month
Port:
Qingdao
Payment Terms:
T/T L/C Cash
Delivery Detail:
10 days

Quick Details View All >

Brand Name:
Shinway
Place of Origin:
China
Model Number:
SWMUJ
Type:
Beam Rack
Capacity:
Customized according to customer requirements
Scale:
Heavy Duty

Qingdao Shinway Machinery Co.,Ltd

Business Type: Manufacturer
Main Products: Storage Equipment ,warehouse Equipment ,goods shelf ,Storage cage ,pallet

Product Details


Qingdao Shinway Heavy-Duty Drawer Racking is a kind of rack which mainly stores a variety of mold items, according to the requirements of loading capacity can be divided into light Drawer Racking and heavy Drawer Racking. The top of the rack can be equipped with a mobile hoist truck to facilitate the lifting of the mould.

 


Drawer Racking is usually welded with rectangular tubes and 4.0 bending parts to form overlay steel plates. The guide groove is formed by bending 4.0 steel plate. The top and bottom are connected by crossbeams, and the top is covered with roofs. The roof can store articles.

 


Shinway Heavy-duty Drawer Racking uses the heavy-duty rack as the whole frame and installs guide rails and drawer pans on the rack pillars. Generally, no less than 90 x 70 columns are required.

 


The Drawer Racking is made up of pillars and pull rods. The guide groove is installed on the pillars. The upper and lower parts are connected and fixed by crossbeams. Then the drawer pallet is installed in the guide groove. The limit pin and guide rail are upper, and the roof is laid at last.

 


If there is no traveling crane in the factory building, ceiling track and cranes can also be erected on the rack posts, and manual or electric mobile hoist truck can be installed. ceiling track shall be welded with beams not less than 100 x 50.

 


When the black embryo is finished, the whole parts can be packaged and shipped by shot peening, oil removal, rust removal and the last surface treatment process of playing.

If you have any requirements, please do not hesitate to contact us, we will provide you with professional warehousing equipment and warehouse design service.



Contact Supplier

Ms. Zhao Chat Now
Mobile
86-18663912837

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Service Equipment > Cargo & Storage Equipment
Categories
Hi~