ISO2531 ductile iron di dedicated coupling for DI pipes
USD $6.56 - $89.9 /Piece
Min.Order:100 Pieces
shanxi midas industrial co.,ltd
Ductile iron Universal wide range flange adaptor for PE pipes
China PN16 di ductile cast iron restrained coupling for PPR pipe
ISO2531 DN1000 ductile cast iron di step coupling for di pipe
ISO2531/EN545 ductile cast iron di gibault coupling for PVC pipe/ steel pipe/ AC pipe
ISO2531 ductile cast iron di superange quick adaptor for PE pipes
ISO2531 ductile iron di dedicated coupling for DI pipes
Body | ductile iron GJS450-10 |
Gland | ductile iron GJS450-10 with brass ring |
Gasket | EPDM/SBR |
Bolt | Carbon stee galv. grade 8.8,stainless steel or carbron steel |
Coating | Fusion bonded epoxy |
Pressure | PN10,PN16,PN25 |
It’s our pleasure to serve the water and wastewater industry, We hope we get the opportunity to do business with you soon!
Shanxi Midas Industrial Co.,LTD
FAQ
1. How is your price?
A: Although we have brand-name products, our prices are very favorable and competitive.Because of our best price, customers from all over the world come to purchase our products.
2. How long is your warranty?
A: Our Warranty is 12 month.
3. Can I get free samples?
A: Yes, we can provide you the free samples, but you need to bear their own delivery costs.
4. Can I request to change the form of packaging and transportation?
A: Yes, We can change the form of the packaging and transportation according to your request, but you have to bear their own costs incurred during this period and the spreads.
5. Can I request to advance the shipment?
A: It should be depends on whether there is sufficient inventory in our warehouse.
6. Could you specially design and produce for clients?
A: Sure, we have all kinds of professional engineers.We can design and produce special products according to customers' request. Such as: special size, special control, OEM, etc.
7. What’s the MIDAS main market?
A: Our main market is African, Middle East Countries, South American, Asian.
8. What’s your payment?
1) 100% T/T
2) 30% in advance, others before shipment.
3) L/C