sludge dewatering machine for dewatering slurry from subway and tunnel construction
sludge dewatering machine for dewatering slurry from subway and tunnel construction

sludge dewatering machine for dewatering slurry from subway and tunnel construction

USD $62000 - $65000 /Piece

Min.Order:1 Piece

Supply Ability:
10000 Piece / Pieces per Month
Port:
Guangzhou
Payment Terms:
T/T
Delivery Detail:
20 days

Quick Details View All >

Brand Name:
MEIBANG
Place of Origin:
China
Model Number:
DYQ3500WP1FZ
Type:
Other, dewatering slurry from subway and tunnel construction

sludgedewateringmachine

Business Type: Manufacturer
Main Products: belt press filter dewatering for mining and quarrying slurry ,slurry dewatering machine for sand washing plant ,Sludge dewatering machine for pulp and paper mill ,cow dung dewatering machine ,cocopeat dewatering machine ,dyeing waste dewatering machine ,river sludge dewatering machine

Product Details

What do we use  sludge dewatering machine for dewatering slurry from subway and tunnel construction for ?

 

With the accelerating development of the city, environmental protection has been plaguing us. How to dispose of a large amount of mud produced in industries such as construction, subway, ramp, drilling and piling has always been a problem. In the past, tank trucks were used to transport them to more partial locations. Or directly into the river, this is not only expensive, but also caused secondary pollution to the environment, the actual problem has not been resolved. The mud compactor produced by MEIBANG is dedicated to: piling mud treatment, drilling mud treatment, and mud treatment of subway tunnel construction. The mud is mechanically and filtered mud cake can be used as brick or retort. The filtered water can be used for production or discharge into the river, which saves the company a lot of money and solves environmental problems.

 

Introduction of  sludge dewatering machine for dewatering slurry from subway and tunnel construction

Belt Filter Press dewaters slurries of pre-thickened solids from a pumpable liquid phase to a solid, conveyable, and stackable cake. Over 30 years ago, belt presses were applied for dewatering thickened tailings resulting from mineral washing processes. Today, belt press dewatering remains a preferred technology in the construction aggregate, mining, industrial and municipal markets.

 

Dewatering process of sludge dewatering machine for dewatering slurry from subway and tunnel construction  includes follow steps:

 

1.pre-condictioning(floccation)2.feed distribution3.gravity drainage4.wedge pression(shear)lid discharge

Technical parameters of  sludge dewatering machine for dewatering slurry from subway and tunnel construction

ITEM NO:DYQ3500WP1FZ  Power:50KW  Filter belt width:3500mm Mud throughput:80-100 cubic meters per hour size:15000X4500X2700MM Machine weight:17.2ton

 

Application of  sludge dewatering machine for dewatering slurry from subway and tunnel construction:

large sand washing plant,piling and drilling slurry dewatering treatment,slurry dehydration of ceramic-cutting powders ,brick-making slurry,river silt treatment,industrial effluent treatment.

Function of  sludge dewatering machine for dewatering slurry from subway and tunnel construction:filters and separation of industrial waste sludge

Specialty of the  sludge dewatering machine for dewatering slurry from subway and tunnel construction :

Water content after dehydration: 25-30% The equipment is fully automated, no need to guard by workers.the filtered mud cake after dewatering desposal by the  sludge dewatering machine for dewatering slurry from subway and tunnel construction

 can be packed and transported away for economic recyling.the filtered water can be recyled for production.

  sludge dewatering machine for dewatering slurry from subway and tunnel constructionProduct advantages:

Large amount of mud treatment and low power consumption

The operation is simple,the labor intensity of the workers is low

24 hours automatic&continuous operation

After treatment,the water can be recycled

High dehydration efficiency;mud cake with high solid content

Long gravity dewatering zone

 sludge dewatering machine for dewatering slurry from subway and tunnel construction:

MEIBANG can give advices on the dehydration process of the entire production line and renovating the old production line design for free.one year of warranty period.the company can dispatch professional technicians overseas to serve the customer for inspection,maintenance,technical consultation,technical guidance and other on-site

 


Contact Supplier

Recommended Products

View More View Less

Find Similar Products By Category

Environment > Waste Management
Categories
Hi~