stainless steel 1 piece male female bsp npt ball valve
USD $5 - $100 /Piece
Min.Order:1 Piece
All Size Forged Male Female Brass Filter valve/ Brass Y strainer valve
Flange Type DN900 Eccentric Butterfly Valve Metal Seat Waste Water
High Performance Metal Seat Butterfly Valve Ductile Cast Iron
Eccentric DN900 Triple Butterfly Valve For Water , Oil , Steam
DN900 Triple Butterfly Valve Metal Seat With Pneumatic Valve Actuator
One.Product data:
BV-S1 stainless steel 1 piece male female bsp npt ball valve
Nominal Diameter:
-1/2''~4''
Nominal Pressure:
-Class150~Class300
Working Temperature:
- -20℃~200℃
Applicable Medium:
-Water,Oil,Gas,Steam
Material Could Be:
-Stainless Steel 304,316
Two related product:
Three.Company profile
Tianjin Nbestvalve Co., Ltd. was established in 2002, headquartered in No.21,No.1 Building, Ronghui Business Zone, Zhongguancun technology Park, Binhai New District, Tianjin, China. With the rapid development of the most dynamic Chinese Bohai Economic Rim, Our company, production, sales and manufacturing test capabilities, with independent import and export rights, is a science, industry and trade as one of the group enterprise.
Four.Aplication Area
a. Domestic sewage treatment.
b. industrial wastewater treatment.
c. industrial irrigation treatment.
Five.Packing and Freight
Six.FAQ
Q: Are you trading company or manufacture?
A: We are factory located in Tianjin, China.
Q: What's your product range?
A: We specialize in product butterfly valves,solenoid valve, gate valves, check valves, Y type strainer, water controlling valves,motorized valves,pneumatic valves,hydraulic valves and other pipe accessories.
Q: What's execution standard?
A: ISO/ANSI/DIN/JIS/EN/GOST standard.
Q: What's your strong product?
A: Concentric butterfly valves, grooved butterfly valves, dual plate check valves.
Q: Do you provide sample? Is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of the freight.
Q: How long is your delivery time?
A: Generally it is 7 days if the good are in stock, or it is 20 days if the goods are not in stock, it is according to the quantity.
Q: What is your terms of payments?
A: Payment ≤10000 USD, 100% in advance. Payment ≥10000USD, 30% T/T or other ways in advance, balance before shipment.
Seven.Contact us