The 5000L water tank blow making machine can be used to produce water tank from 1000L to 5000L in 1-6 layers.
Using a more energy-efficient IKV screw, the blow molding machine’s plasticizing ability is 1.5 times faster than similar products.Yankang ultra-large blow molding machine above 5000L has successfully occupied major markets.
Excellent quality, perfect service, and high cost performance make our blow molding machine win the trust and support of our customers.
Latest Technology
1.FOAM LAYER :Foam layer as a new innovation which can increase the wall thickness.
2.INDUCTION HERTERS:Induction heaters for die head and extruder can save 40-50% energy.
3.SERVO MOTOR:Servo motor for clamping system which can save 40% energy.
4.REMOTE SERVICE:It is easier to check the machine operating conditions including cycle time and output. In addition, it is easy to check the machine fault and judge the machine problem.
More advantages about our blow molding machine:/technology-advantages/
Leading International Technology
Multi-layers Die Head Technology
First,multi-layer mold design makes the wall thickness uniform and stable. Second,it can increase production efficiency by 5 times. Finally,the utilization rate of recycled materials increased by 4 times.
The 5000L water tank blow molding machine can produce 1000L to 5000L water tanks.
Customer Service
TRAINNING
The buyer could dispatch their operators to the seller’s factory for training, including machine operation, maintenance & simple repairs;
Or against the requests of the buyer, the seller’s technician could train the buyer’s operators in the buyer’s factory in the periods of installing & adjusting;
INSTALLATION & ADJUSTMENT
The seller could dispatch an engineer against the requests of the buyer to install and adjust the machines for one week(free of charge) in the buyer’s factory. After one week,if the buyer still needs the training,$100 should be paid for the engineer.
The buyer should make a reservation in advance before delivery of the machines;
The buyer should pay for the engineer’s food & board while installation in buyer’s factory.And the buyer should also pay for the air ticket for the engineer.
GUARANTEE
The guarantee time is one year after the machines normally works in the buyer’s factory, if only the problem is cause due to quality control or any reason by the seller. We will supply replaced parts free of charge and our engineers will guide you how to solve the problems.