Kraft paper machine, corrugated paper machine, paper machinery
USD $63000 - $150000 /Set
Min.Order:1 Set
Falong paper machinery and equipment factory
Kraft paper machine, 1200mm box board paper machine, corrugated paper machine
1092-1200mm multi net double cylinder paper machine
Technical parameters:
Variety: corrugated paper, cardboard paper
Making quantitative: 110 - 260g/m2
Width of net paper: 1092-1200mm
Cage width: 1450mm
Production capacity: 3-5T/D
Gauge: 1800mm
Transmission mode: AC variable frequency speed regulation, step by step transmission.
Main equipment structure:
1. Network Department: Three cages of 1000mm x 1450mm, four volt rolls of 350mm x 1500mm (including one return roll), rubber hardness Shore 380 + 2, with return roll device, three netting slots are made on site.
2. Pressing Department: a 400 mm *1500mm stone roller, a 350 mm *1500mm rubber roller, rubber hardness "A" 920 +2, pneumatic pressure device.
3. Drying section: two drying cylinders of 1500mm *1450mm, one supporting roller of 350mm *1500mm, (70 wire in standard height), one pressing roller of 350mm *1500mm, one rubber hardness of "A" 920 + 2, pneumatic pressure device, two cylinders with drying net device.
Four. Coiling part: 1092mm web type paper winder.
Five, transmission and control department: adopt AC frequency conversion speed regulation, step by step transmission, all digital closed loop control system.
Technical services:
1. The detailed list of the equipment is very clear. There are 3 copies in total, one for archiving, one for users and one for sales.
2. After the confirmation of the contract between Party A and Party B, Party A receives a 30% deposit and takes effect. The goods will be delivered in 20-30 days (including: the large and small parts are completed together with the outer packing).
3, the company's full set of equipment quality warranty for one year, according to the Chinese product quality warranty law. Vulnerable parts are not within the scope of warranty, remarks: (screws, bearings and other standard parts).
4. (1) customers should cooperate with the provision of labor services, but must obey the direction of engineers.
(2) Provide venues, cement, brick, sand, steel, cutting machine, electrical welding (two personnel), lifting equipment and power lines, lighting lines, steam lines, water lines, slurry lines and other tools. The above users cooperate very quickly, installation, commissioning, commissioning, to the customer a qualified production line, can be completed in about two months.
5, engineers, the treatment of technicians:
(1) Installation technology, maintenance technology, pulping technology, production and operation technology, all free to the user to master, can skillfully operate production until.
(2) installation personnel arrangement:
A technician, a monthly salary of 4500 yuan (RMB), pay wages on time every month.
Users should bear the costs of engineering and technical personnel, long-distance and short-distance, in your work period should bear, food and accommodation, personal safety, medical care and health, communications and other security. Any accident or ill treatment outside your body is the responsibility of the user.
Sales Manager: Hao Ying Feng, 0086-13603894288
WhatsApp: 86-13603894288
imo: 86-13603894288
Email: 940746614@qq.com