BW250 Triplex Mud Pump|Drilling Pump
BW250 Triplex Mud Pump|Drilling Pump
BW250 Triplex Mud Pump|Drilling Pump
BW250 Triplex Mud Pump|Drilling Pump

BW250 Triplex Mud Pump|Drilling Pump

USD $3000.00 - $5000.00 /Piece

Min.Order:1 Piece

Supply Ability:
50 Piece / Pieces per Month
Port:
shanghai
Payment Terms:
T/T L/C
Delivery Detail:
5 days

Quick Details View All >

Brand Name:
zhongtuo
Place of Origin:
China
After-sales Service Provided:
Engineers available to service machinery overseas
Warranty:
1年
Weight:
600KG
Certification:
SGS

Shaanxi Zhongtuo Mine Equipment Co.,Ltd

Business Type: Manufacturer
Xi'an Shaanxi China
Main Products: Concrete splitter ,Bridge tensioning equipment ,DTH drill ,Cement mortar pump , Automatic rebar bending machine , Shotcrete equipment , Mud pump drilling ,Section bending machine

Product Details

Description of BW250 Triplex Mud Pump|drilling pump


BW250 Triplex Mud Pump-00.jpg  BW250 Triplex Mud Pump-02.jpg   


BW250 Triplex Mud Pump-03




BW250 Triplex Mud Pump:

  1. Be sure that the pump foundation is level and able to support the weight of the pump.

2. Install the pump as close as possible to the mud tank or pit to reduce drop in suction line. 


SUCTION SYSTEM 

  1. The diameter of the suction line must be equal to or exceed the diameter of the pump suction connection.

  2. Use as short a suction line as possible.

 3. Install the suction line in as straight a line possible. If turns are necessary use long radius ells.  4. Install a section hose in the suction line to isolate vibration. 

 5. Be sure there are no air traps or air leaks in the suction line. 

 6. Install a charging pump in the suction line. (See CHARGING PUMPS.) 

 7. Install a suction desurger to prevent mud cavitation. (Refer to FLUID END ACCESSORIES in Section 4 of this guide.) 

 8. Fully open all valves in the suction line before operating the pump.




Tips for PREPARATION:

  1. If the pump was not completely assembled at the factory, complete the assembly as required.

 2. Check to be sure the suction and discharge systems have been properly installed. (SEE INSTALLATION) 

 3. Remove the cover plates from the power end. 

 4. Inspect the power end for contamination. Clean as required. 

 5. Drain all condensation from the power frame (Figure 1-4). Fig. 1-4 Power end drain plug Do not attempt to drain condensation from power frame if unit has been filled with lubricant. (why?) 

 6. Install cover plates. 

 7. Check that crankcase drain plug is installed and tight. 8. Fill the power end with correct lubricant.


Contact Supplier

Ms. Jessie hu sales manager Chat Now
Telephone
86-029-62322708
Mobile
86-13571973823
Address
No.27, Beichen Village Industrial Park, Weiyang District, Shaanxi Province Xi'an,Shaanxi

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Engineering & Construction Machinery > Mortar Spray Machines
Categories
Hi~