30 m3 Customized Bulk LPG Gas Storage Tank
USD $11880 - $18810 /Set
Min.Order:1 Set
Design,manufacturing,test standard
TSG R004-2009《Fixed pressure vessels safety and technical supervision regulation》 GB150.1~150.4-2001《pressure vessel》 NB/T47015-2011《welding specification for pressure vessels》 JB/T4730-2005《Nondestructive Testing of Pressure equipment》 GB/T30583-2014《pressure equipment heat treatment after welding procedures》 | ||||||
Technical Parameter of 30M3 LPG Tank | ||||||
LPG Tank | Volume of LPG Tank | 30,000litres | ||||
Medium | LPG | |||||
Density of medium | 560kg/m3 | |||||
Filling coefficient | 0.90 | |||||
Design pressure | 1.77MPa | |||||
Working pressure | 1.63MPa | |||||
Design temperature | -20℃~+54℃ | |||||
Shell thickness | 12mm | |||||
Head thickness | 12mm | |||||
Main materials | Q345R | |||||
Weigh in theory | 6870KG | |||||
Total length of tank | 10296mm | |||||
Corrosion allowance | 1mm | |||||
Hydrostatic test pressure | 2.28MPa | |||||
Air tightness test pressure | 1.77MPa | |||||
Design using life | 20years | |||||
Heat treatment | Whole tank post weld heat treatment | |||||
1.The surface coating by sandblast derusting, spraying, blowing and other advanced technology. 3.Strict adopt scientific advanced construction process, to ensure that the Lowest shrinkage、maximum dimensional stability in the condition of low temperature. 4.Strict quality appraisal for the quality of the material, the appearance and the quality of the weld, the quality of the operation, the quality of the installation, the installation quality, the internal device and the safety accessories. 5.The geometrical position of the welded joint, the weld line, the tank head and the pressure elements are in strict with the X ray nondestructive testing and the helium mass spectrometer. 6.On the product's sealing, pressure resistance, and all the technical indicators that affect the safe operation of the product testing. 7.For welding products using fully automatic welding technology, tank through the whole heat treatment, 100% inspection, sandblasting before painting, ensure antirust paint and paint does not fall off. | ||||||