Brass Network Fork Cable Terminator
USD $0.05 - $0.09 /Piece
Min.Order:1 Piece
Dongguan Shengjia Hardware Products Co., Ltd.
1. Tooling (Mold) design and Manufacturing.
2. Manufacture the parts according to the Stamping Machine.
3. Riveting, Welding or Screw tap according to Customer's require.
4. After finish manufacture process we will test the parts by the Image measurement instrument, Caliper, Angel Gage etc.
5. After make sure all the dimension can reach customer's require, we will make the surface treatment process.
6. After finish surface treatment we will test all the parts by worker so that we can make sure the parts which we sell is 100% qualified.
7. After finishing test we will pack the parts by Vacuum Package Machine.
60T/80T high speed automatic machine, 24 hour uninterrupted operation; produced by progressive mold,almost one piece item in 0.1 seconds. So you don't need to worry about our production ability.
There're about 50% of metal parts manufacturer in Dongguan.
Shengjia consolidate the leadership in this industry in dongguan.
DesigIn window hardware production,we have written working instructions for each product and each machine,all operations are implemented exactly according to the SOP.
Professional R&D team
Professional R&D teamn and manufacturing our own tooling.
Offer professional suggestions to improve window hardware
100% inspection by trained producer, producing manager, IPQC, QC manager.
Iso 9001:2008,TS 16949, China Credit example, Government supporting company enterprise,etc.Have own Import& Export license.
We strive for continuous improvement and repeated circulation by constant pursuit and innovation to achieve the perfection on costs, quality, delivery, service and management
All Staff Involved Strengthen Management
Overall Control Continuous Improvement
We try to achieve the preventive effect through the process control and stop the occurrence of deficiency
Our goal to product’s quality is zero defect, and we require the involvement of all employees in order to achieve the target.
A: Shengjia hardware is metal parts manufacturer since 2002. Now we consolidate our leader-ship in metal parts industry in China.
Some of our honorable clients: BMW, Benz, Panasonic, Siemens, etc.
A: Generally it is 5-10 working days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: 50% deposit for mold & mass production, 50% balance after samples confirmed or before shipment.