1.what is intelligent Banner welder machine?
This machine is use for weld split PVC, PE and other material can be hot melt. use hot air to melt the material and joint them together. it can move itself in work; with sensor in the welder nozzle, can control the work temperature accurately;
2.specification
Brand name | Colorsun |
Rated voltage | AC110-240V |
Frequency | 50-60HZ |
Power | 1000-3000W |
Temperature scope | 0-500°C |
Speed scope | 1-15m/min |
Dimension | 41*25*20cm |
Weight | 15kg |
Splicing width | 2-5cm |
Warranty | One year |
3.Advantage
1.No need glue, use hot air to weld;
2. Temperature, speed, fan motor speed are adjustable;
3.Welder nozzle has a sensor, can make the true temperature accurately;
4. High welding quality.
5. R & D capacity:Our company has all the key technology, the quality of the machineis//is in control.
4.Accessories
a 10m power cable, spare parts of a heater, a set of manual and video CD.
5.How to operate?
1). Before hemming or welding, leave 30-40mm wide overlap edge for connection the two disjunct surface pieces, immobilize both ends of each disjunct pieces with something such as stick belt or clamp.
2). Turn on the power, according to quality and thickness of the PVC banner, consider the ground circumstance, set the proper termperature and speed, adjust the suitable hot-air blowing rate, wait for machine hot up around 2 minutes.
3). Bring up the machine, place the rubber wheel at the end of the overlap edge.
4). Turn the handle to left down, insert the welder nozzle into the gap of two overlap pieces, then the machine will moving and seaming automatic.
5). During welding, use the gripe to align the moving direction, let the upper piece edge be in touch with the inner side of the welder nozzle.
6). After the machine go pass the overlap edge to the end, the two disjunct pieces will be joined together, then turn the welder handle to right, it will stop moving.
7). Turn off the heater switch, wait the gun come to cold, then turn off the power supply is ok.
8). Notice: To prolong the electrothermal heater, after work it is strongly advice that cooling the heater at first, then turn off the power 5 minutes later. In case of the power suddenly be off, should handle the welding gun away firstly, and close down the temperature knob, nextly consider the problem of power supply.
9). To get better satisfied bonding effect, the ground of the overlap pieces should be smoothly, hard and heat resistive. We suggest that the operator may do some more test and practice using some samples of the pieces to get the suitable speed and temperature and hot-air blowing rate before operate it for seaming formally.
Shipping term:DHL,FEDEX ,TNT,By air,sea and so on.We'll be choose the best economic and safety way for you.
Payment term:TT,Western Union,Paypal,Money Gram ,deposite first is also ok.
Delivery date;About 3-5 working days.
Repair and maintenance
Fault | Remedy |
Temperature is garbled, the actual temperature does not show
| Check the temperature probe whether the grounding be kept vacant nozzle.View probe is broken, repair the sensor line. |
Temperature not rise | Check whether the fuse heating parts, heating parts replacement if the fuse. |
No power | Check the wiring is solid or not, protective tube burst. |
Scratch the screen | Adjust the nozzle and parallel ground,keep the right lateral of wind mouth form the ground 1mm |
Speed out of control
| Replace potentiometer (black knob) |
Welding is not strong
| Rise temperature degree or slow the speed,Adjust the nozzle parallel with the ground.. |