GB5310-95 GB9948-88 seamless carbon pipe
USD $600 - $600
Min.Order:50
tianjin fushunda steel industry co,.ltd
-------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------Specification as follows:
Item |
Material |
Standard |
Specification(OD*WT)mm |
Usage |
Alloy pipe |
Cr5Mo 15CrMo 12Cr1MoV P11/22 T91,P91,P9, T9 Wb36 |
GB5310-95 GB9948-88 ASTMA335/A335M ASTMA213/213M DIN17175-79 JISG3467-88 JISG3458-88 |
16-824*2-100 |
The seamless steal pipes features resistance to high presure,high/low temperature and corrosion ano is used in the industries of petroleum,chemical engineering and. Electric pwer as well as boiler |
High-pressure boiler pipe |
15CrMoG 12Cr1MoVG 20G,A106, ST 45-8
|
GB5310-95 ASTM A 106-99 DIN17175-79 |
14-630*2-80 |
Temperature-resistant seamless steel pipe far high-pressure boiler |
Seamless pipes for petroleum
|
20, 12CrMo, 15CrMo, Cr5Mo, Cr9Mo |
GB9948-88 |
10-530*1.5-36 |
Boiler pipes for refinery,heatexchangeing pipes,seamless steel pipes for pipeline |
High-pressure Seamless pipes for fertilizer making equipment |
20, 16Mn, Q345 |
GB6479-2000 |
18-530*3-40 |
Fertilizer making equipment and pipe line |
Low and mediun pressure boiled pipe |
10,20 |
GB3087-1999 |
10-530*2-40 |
Over-heat pipe for low and medium pressure boiler,boilling water pipe,locomotive somke pipe(big and small) |
Fluid pipe |
20, Q345 |
GB/T8163-1999 |
8-630*1.0-40 |
Fluid feeding |
Structural pipe |
10,20,35,45, 16Mn,Q345B |
GB/T8162-1999 |
6-1020*1.5-100 |
For commom structure |
Line pipe |
Gr..B |
API 5L/CT |
21.3-813*1.5-40 |
Carrying gas,water or oil in the industries of petroleum and natural gas |
Hydraulic prop pipe |
27SiMn |
GB/T17396-1998 |
70-377*9-40 |
Hydraulic support and prop |
1.Surface Treatment:
Transparent oil or black painting anti-corrosion
2.Application:
Natural gas, petroleum, chemical industry, electric power, metallurgy thermodynamic fields, water supply engineering, steam heating, hydroelectric power station and long pipeline transportation projects.
3.ends: 2" below plain ends; 2"above beveled ends
4.Packaging:
Wooden Cases or wooden pallet bundle packing, paint on the pipe, plastic covers at the ends or as per customer requirement.
5 Ton If less than 5 tons can be solved by our communication
6.LOADING PORT:TIANJIN port
7.Delivery Time: 15-35days
According to customer’s requirements or normal delivery
8.AUTHENTIFICATION:
ISO 9001:2000 API 5L/5CT
9.Delivery Term:
FOB (30% downpayment in advance, the balance before shipment)
CIF (30% in advance, the balance against with the copy of B/L)