Colorful elegant folding waterproof canvas screen bamboo folding screen sliding doors interior room divider GVLB03
USD $16.5 - $18.9 /Piece
Min.Order:100 Pieces
Huzhou Greenviews Commodity Co., Ltd.
ITEM | Bamboo room divider folding screen |
Material | Bamboo/Paper rope/Cotton wood frame/Metal Hinge |
Size available | 1 173X36/panel 3 panel. 180X108cm 3.8KGS 2. 173X36/panel 4panel. 180X144cm 5.0KGS 3. 173X36/panel 5panel. 180X180cm 6.1KGS etc.as your reques
|
Design | 1. 100% handmade 2. All using materials are of high quality and environmental friendly
3. Different color and size can be customized(OEM service avaliable)
|
MOQ | 100PCS/item |
Packing | 1pc / Carton, 2.3Cu.ft. |
Container Loading | 1050pcs / 40'HQ |
Delievery time | 15days sample time,35days after sample of approval |
Payment item | T/T or L/C at sight/Others |
Shipment | FOB Shanghai/CIF |
Q1: How to control the products’ quality?
We have always placed great emphasis on quality control to ensure that excellent quality level is maintained. Moreover, the principle we always maintain is "to provide customers with better quality, better price and better service".
Q2: Can you provide OEM service?
Yes, we work on OEM orders. Which means size, material, quantity, design, packing solution, etc will depend on your requests; and your logo will be customized on our products.
Q3: What information should I let you know if I want to get a quotation?
1, Size of the products
2, Material and stuff(if have)
3, package
4, Quantities
5, Please send us some pictures and designs for checking if possible so we can do best as your request. Otherwise, we will recommend relevant products with details for your reference.
Q4. Where is Greenviews? Is it possible to visit your factory?
A: We are located in Huzhou. It is very convenient to visit us, and all clients from all over the world are highly welcome to us.
Q5.Shipping Method and Shipping Time?
1. Express courier like DHL, TNT, Fedex, UPS, EMS etc,shipping time is about 3-7 working days depends on country and area.
2. By air port to port: about 7-12days depends on port.
3. By sea port to port: about 20-35days
4. Agent appointed by clients.
Q6.What is the MOQ for your production?
A. The MOQ depends your requirement for color, size, material and so on. For some normal items, we have stock, will have no MOQ requirement.