Custom Made Golf Head Investment Cast Stainless Steel with CNC Milling Machining
USD $5 - $100 /Piece
Min.Order:1 Piece
Valve Fitting Parts Lost Wax Casting Stainless Steel Investment Casting Parts
ISO9001 Approval Stainless Steel Casting for Vacuum KF Clamp Parts
CNC Machine Lost Wax SS Stainless Steel Casting for Double Claw Clamp
OEM 304 Stainless Steel Casting for Single Wall Clamp , Vacuum Investment Casting
ISO9001 Approval Lost Wax Casting Stainless Steel Investment Casting
Silica Sol Alloy Steel Precision Investment Castings for Gun Spare Parts
Custom Made Golf Head Investment Cast Stainless Steel with CNC Milling Machining
Product Name : Stainless Steel Casting Parts With ISO9001 Approval for Golf Head Parts
Casting Process : Lost Wax Process
Casting Process Typie : Silica sol casting
Machining : CNC Milling / CNC Lathe
Application : Door Fitting Parts
Material : SS304
Materials: SUS304/SUS430/Ti |
Available degree: 10°, 10.5° |
Fashion Shape |
Hot Forged 460cc |
Weight: 198 gr ± 2 gr |
top quality and competitive price |
The logo and the shafts can be made according to clients requests |
Super high tensile strength titanium, 460cc head volume constructed in hot forged hitting face for making more explosive tee-off shot, delivers higher ball speed with less spin for extra long distance.
1. Can I get samples?
Sure. We usually provide free samples for your reference before order confirmation.
2. Can I add a logo on the product?
Yes. Customized logo is welcome, you can make your logo on the product.
3. How about the lead time?
It takes 3-5 days for samples. And for production, it takes 30-45 days after the receipt of deposit and confirmation.
4. How about your payment way?
Basically, we accept T/T or western union or irrevocable L/C at sight.
1. Wholesale of golf driver, golf irons, golf woods, golf putter, golf wedge. All of them we have enough stock.
2. Popular design according to your own requirement.
3. High quality with competitive price.
4. Packaging: with original package
5. Prompt Delivery: Within two work days after receiving your payment, and about 10-15 days to dispatch products.