water based tile concrete floor sealer / coating building materials

water based tile concrete floor sealer / coating building materials

Negotiable

Min.Order:1

Supply Ability:
0 per Month
Payment Terms:
T/T L/C D/P D/A
Delivery Detail:
7 days

Quick Details View All >

Brand Name:
YUNYAN
Place of Origin:
China
Model Number:
YY-125A / 125B

Guangdong Yunyan Special Cement Building Materials Company

Business Type: Trading Company
Main Products:

Product Details

Delivery Time:5-7 working days
Certification:ISO 9001

water based tile concrete floor sealer / coating building materials

Product features

1. It can increase density and permeability functions of the floor layer.
2. It can strengthen abrasion resistance and impact resistance effectively of the floor.
3. It has good fouling resistance and dustproof performance.
4. Daily maintenance is simple and convenient

Scope of application
Applied in the light of the concrete and the mechanical virgin pulp carborundum wearable floor surface, through the effective penetration and the sealing function to improve anti-fouling permeability and enhanced hardness of the floor.
The product is mainly for construction to avoid producing white phenomenon.

Construction method
Before construction, the concrete floor need a curing period of 28 days and the floor hardener need a curing
period of 14 days, each layer’s materials natural drying time is about 10 ~ 15 hours, before painting it again,
it needs to confirm the ground is dry.

1. Use mop add water clean surface.
2. Grinding the old concrete 6 times with #50, #100,#200,#300,#500 and #800 wet pad or the floor hardener
5 times with  #100,#200,#300,#500 and #800 wet pad alternately and make it smooth. 
  Attention: with water to grinding.
3. Inhale all the dusty and water by vacuum clean machine, wait to next process until the surface is completely dry.
4. First time put seal hard primer YY-125A on the floor and keep it wet for about 30mins. 
  Attention: can use any kind tool, for example: brush, broom, big mop.
5. After 24 hours the surface is dry, grinding with #1000 wet pad for first time.
6. After grinding put second time seal hard finisher YY-125B on the floor and keep it wet for about 30mins,
  wait 24 hours, polish it with dry pad #2000 (with no water) to be smooth and bright.

Technical parameters
Test Item Executive Standard UNIT Concrete specimen before trial Test data after trial
Compressive strength comparison JC/T 906-2002
Concrete floor cement based material(according artical 7.5) Mpa 20 36
Surface hardness comparison Mohs hardness  Grade 3.5 5
Execute china stander of JC/906-2002

Storage period
Keep in dry place, unopened product is valid for 1 year.

Unit usage about: 0.5kg/m2 (for two coats)

Spec.
YY-125A   blue barrel   25kg/barrel
YY-125B   white barrel  25kg/barrel
 

Contact Supplier

Mr. David Wu sale Manager Chat Now
Telephone
86-020-83550760
Mobile
86-02083550760
Fax
86-020-22810051
Skype
david8883888
Address
Room 1709 Jinying Building No. 316 Huanshi zhong Road,Yuexiu District Laiwu,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Agriculture Machinery & Equipment > Farm Machinery > Tractors
Categories
Hi~