Product Details
Gas water heater parts pilot burner B880205-2STDBrief Introduce:Pilot Burner is a kind of product that is derived from some specific gas appliance which is required to meet some buring characteristics. There are mainly two types, thermoelectric type safety device and ion-detection safety device.Thermoelectric type safety device: It is assembled by thermocouple, pilot and electrode.Main function: To ignite the main burner without deflagration, to stabilize the flame of main burner, and to cut off the energy source when the flame is put out by external factors.]Ion-detection safety device: It is assembled by pilot, detection needle and electrode.Main function: To ignite the main burner without deflagration, to stabilize the flame of main burner, to detect flame normality, and to reignite or cut off the energy source when the flame is put out by external factors.Quick details:Model No.:B880205-2STDBrand Name:BngasApplication:Adjustment of the gas flow and primary aerationMaterial:Metal (Brass/Stainless Steel)Feature:Eco-friendlyNozzle orifice0.15-2.0mmGas tubeAluminum/Copper (4mm,6mm and 1/4")Gas inletHorizontalPowerApproximately 210WSpark ElectrodeAvailableFlame hoodsOne flame hood with different orientationCertification:CE/EU, ISOMOQ:1000pcsSupply Ability:40000PCS/MONTHPort:Shanghai /NingboPlace of Origin:Zhejiang, ChinaPayment Terms:1). L/C at sight.2). T/T: 30% Deposit, Balance before shipment.3). Paypal.4). Western union.This pilot burner is designed to have adjustment of the gas flow and primary aeration. This allows their use with any kind of gas (multigas), or they can be supplied for a specified gas family. Due to their versatility and simple design, they are suitable for universal use and combine characteristics of economy with good performance. Packing & Delivery: Packing details: 25pcs/box,200pcs/carton,with standard export carton;Packing size: 450*235*320/450*235*165/235*230*160mm;Delivery method: By sea, air or express;Delivery time: 30 days upon receiving depositAdvantages:1. Inspect the raw material before production;2. Control each procedure in the production;3. 100% inspection before shipment to ensure good quality.