Upward Continuous Casting Machine AC Three Phase 380V for 20mm Brass Rod
Negotiable /Piece
Min.Order:1 Piece
3000mm/min OFC Rod Continuous Caster Machine Upward Way 7920H Working Hour
High Speed 12.5mm Copper Continuous Casting Machine 3000mt Yearly Capacity
Electric Copper Cable Making Equipment Upward Continuous Casting Machine 5000mt
35mm Rod Up Copper Continuous Casting Machine 380 Kg/H Copper Melting Velocity
10000mt Melting Furnace Copper Wire Manufacturing Machine Frequency Automatic Adjust
Oxygen Free Copper Vertical Casting Machine 12000T / Y 500 Type Three- Body Furnace
Upward Continuous Casting Machine AC Three Phase 380V for 20mm Brass Rod
Feature
1. High accuracy and low backlash planetary reducer is used to make the freezing time more accurate, thus to increase the crystallzing quality.
2. Quick lifting device is used for installing and changing the crystallizer, it can be finished within 10 seconds. When water or power supply stops, the crystallizer can be lifted quickly and leave the copper liquid
3. The paperless recorder is used and is connected to the manager’s computer. All the temperature records within one month can be checked, through which the controlling of the furnace temperature can be more effective and the rod quality can be increased. (chose when the buyer need)
Main Technology Parameter For Copper Rod Up-casting Machine1
2000MTΦ8mm→Φ14.4mm |
2000MTΦ17mm→Φ30mm |
3000MTΦ8mm→Φ14.4mm |
||
Main para-meter | 1 | Model: SYJ0408-I2 | Model: SYJ0417-I2 | Model: SYJ0608-I3 |
2 | Yearly capacity:2000mt | Yearly capacity:2000mt | Yearly capacity:3000mt | |
3 | Furnace structure:300type two- body furnace(1melting furnace,1 holding furnace) | Furnace structure:300type two- body furnace(1melting furnace,1 holding furnace) | Furnace structure:300type three- body furnace(2melting furnace,1 holding furnace) | |
4 | Casting strands:4 | Casting strands:4 | Casting strands:6 | |
5 | Casting rod diameter : Φ8mm→Φ14.4mm | Casting rod diameter : Φ17mm→Φ30mm | Casting rod diameter : Φ8mm→Φ14.4mm | |
6 | casting speed:0~3000mm/min | casting speed: 0~1000mm/min | casting speed: 0~3000mm/min | |
7 | annual working time:7920h | annual working time:7920h | annual working time:7920h | |
8 | Liquid tracking precision:±2mm | Liquid tracking precision:±2mm | Liquid tracking precision:±2mm | |
9 |
Take-up coil standard: φ700mm×φ1500mm×800mm |
Take-up coil standard: φ700mm×φ1500mm×800mm |
Take-up coil standard: φ700mm×φ1500mm×800mm |
|
10 | Copper melting velocity:260kg/h | Copper melting velocity:260kg/h | Copper melting velocity:380kg/h | |
11 | Copper melting power consumption:<350kwh/ton | Copper melting power consumption:<350kwh/ton | Copper melting power consumption:<350kwh/ton | |
12 | Take-up form: frequency automatic adjust | Take-up form: automatic adjust | Take-up form: frequency automatic adjust | |
13 | Take-up plate driven approach: PLC control, frequency adjust,automatic coiling | Take-up plate driven approach: pushed by copper rod,manual adjusting | Take-up plate driven approach: PLC control, frequency adjust,automatic coiling | |
14 | Material feeding method:whole piece of electrolytic copper cathode fed by electric hoist | Material feeding method:whole piece of electrolytic copper cathode fed by electric hoist | Material feeding method:whole piece of electrolytic copper cathode fed by electric hoist | |
15 | Upward driven approach:driven by the AC servo motor, transmission chain is driven by the gapless synchronous cog blet | Upward driven approach:driven by the AC servo motor, transmission chain is driven by the gapless synchronous cog blet | Upward driven approach:driven by the AC servo motor, transmission chain is driven by the gapless synchronous cog blet | |
16 | Rod clamping method:air clamping | Rod clamping method: manual clamping | Rod clamping method:air clamping | |
17 | Operation interface:date display,servo motor controlled by touch screen | Operation interface:date display,servo motor controlled by touch screen | Operation interface:date display,servo motor controlled by touch screen | |
18 | Total power:150KW AC three-phase 380V | Total power:150KW AC three-phase 380V | Total power:200KW AC three-phase 380V | |
Price |
A price: p
Miss. Cherry
sale Manager
Chat Now
Telephone
86-573-83679836
Mobile
86-18857323307
Fax
86-573-83679836
Skype
cherry667181
Address
Room1190,No.106 xinling road China(shanghai), pilot free trade zone Ningbo,Zhejiang
Showroom
|