Durable Wear Resistant Flue Gas Desulfurization Systems High Cost Performance

Durable Wear Resistant Flue Gas Desulfurization Systems High Cost Performance

USD $ 2000 - $5000/ /Piece

Min.Order:1 Piece

Supply Ability:
0 Piece / Pieces per Month
Payment Terms:
T/T L/C D/P D/A
Delivery Detail:
7 days

Quick Details View All >

Brand Name:
HAINA
Place of Origin:
China
Model Number:
XL

Yixing Haina Environmental Engineering Co.,ltd.

Business Type: Trading Company
Main Products:

Product Details

Delivery Time:20 work days
Certification:ISO9001 : 2008

Production Description

Water film Desulphurization Dust Collector (fast-assembling type) is the improvement of traditional granulite water film desulphurization dust collector, with outer lining steel plate, inter lining granite, and middle acid-resistant castable. 1-2 parts are separated transport to site after manufacturing, and assemble at site. It has the advantages of easy installation and short construction period, which is the idea product for boiler and furnace gas desulphurization treatment.

Equipment Characteristics

1. The venturi spray device is made from 316L or other coequal material; spray evenly;2. Equipment can bear under 250℃ high temperature flue gas;3. Water film dust collector using external protection plate, inner lined with granite, adopts high strength anti seepage acid among castable vibration casting;4. The tank is made of acid and alkali resistance, high temperature sintering ceramic material. It also uses the partition to the overflow structure, the cylinder body wall is smooth;5. Equipment made of modular, and it only takes 1 day to complete the installation at site, which reduces the construction period;6. Each cylinder outlet uses concave joints, sealing treatment juncture place when installation, and ensure that joint air leakage leaking;7. Internal corrosion protection of the desulphurization dust collector has unique advantages adopts scour resistance, corrosion resistance, high temperature resistant. Its service life is 10 times longer than light anti-corrosion materials.

Transportation

Installation and Precautions

1.When installing, equipment should refer to general assembly drawing from the bottom to the top sequentially, it can also be installed according to the number of each section. When installing the base of equipment, the base should be placed to the position horizontally, and then the bottom of the position should be covered 1-2cm furan resin daub, the orientations of the overflow hole and manholes should be paid attention to in particular.

2. When the base has been placed to the position, top flange washer should be covered 1-2cm thick furan resin daub from the second section, and then the uppers can be lift one by one.

3.Installation of equipment inlet: orientation of inlet should be determined in advance (ensure the consistency between inlet center of device and the boiler outlet duct center so as to connect with air duct conveniently)

4. Please follow the above steps to install successively. After finishing water tank section, please enter into the device with ladder or scaffold and clear excess cement of cyclone muff, seam between internal section and section should be filled.

5. Installation of annular water pipe: Please pay attention to the position of water feeding and aim the water inlet flange of coil straight at the position of pump water supply and then insert the hose to the ceramic sink. Water pipe and water sink should be sealed with acid-proof mortar (If equipment is equipped with venturi device, annular pipe flange should be on venturi side, so that it is advantageous for the connection between venturi and annular pipe)

6. After finishing the installation of tower, please make sure the seal of flange joints.

Maintenance and Notification
1 Before operation, quality should be checked, and the water supply system should operate normally. The water seal of ash discharge outlet should be tight as well.
2 Before operation, please turn on the water pump and inject water to the inside cylinder until there is large amount of water draining. Then turn on the induced fan. When the boiler shuts down, stop the induced fan for some while and then cease supplying water to the device. (During operation, water-break and dry burning should be forbidden inside the towel. Regular check on spillway trough is necessary, as well as the flue gas temperature and resistant)
3 Neutralization reaction occurs when alkali waste water or flushing slag water can go on with acidic waste water in the sedimentation tank, after purifying, the water can recycle.
4

Check and clean the dust and slag in sedimentation tank on regular and frequent basis, maintain the quality of recycling water and ensure effective space for sedimentation tank.

5 Check the PH value of water in circulating water tank regularly, corresponding lye process should start according to the result of test result (PH test paper can be adopted while testing). When the paper becomes scarlet, lye should be added. It is suggested that water in sedimentation tank shall be in alkaline condition (PH value shall be kept between 9 and 10).
6 If

Contact Supplier

Miss. Jennifer Zhang sale Manager Chat Now
Telephone
86-510-87838893
Mobile
86-13616150788
Fax
86-510-87838899
Skype
Jennifer.zhang917
Address
Gaocheng Town Jiaxing,Zhejiang

New Products

Find Similar Products By Category