Fastening Part Railway Track Fasteners SKL KPO Nabla And E Type
Negotiable /Set
Min.Order:100 Sets
Suzhou ZhongYue Railway Material Co., Ltd
Product Description
SKL fastening system
Meet all the requirements of Tram line. Top-down construction method is available, so sleepers are no needed. It can be used in general line, also in turnout area. It is feasible in open track, also in embedded track. Easy installation, Gauge adjustment 10mm, height regulation +20mm. The static stiffness is no less than 30KN/mm, different stiffness of rail pad can be provided according the requirements of customers.
Product Feature
The demand for fast clip rail fastening system is growing faster than other railroad fastener in the industry.
It is generally pre-assembled in the factory of sleeper manufacturer. The high-safety rail fastener is a
switch on-switch off system developed to meet the growing demand on fast clip rail fastening system.
Our fast clip rail fastener is capable of satisfying user requirement on rapid installation, low installation
cost, and low maintenance cost.
Both the clips and the toe insulators are installed at the parked position, where the side post insulators
and pads are mechanically held in place. All the components are transported to the site. The installation
of the fast clip rail fastening system is quite easy and can be conducted in different ways. The wide
applications make this product quite popular.